SCHEDULE.
SHOWING THE COST OF CONVEYING MATERIALS FROM INTERMEDIATE DEPOT FOR CON-
STRUCTION OF NAPIER ROAD FROM THE TOWN BELT TO MARIS BRIDGE. THE COST
OF LEAVING THE MATERIALS HAS BEEN CALCULATED FROM THE FOLLOWING
FORMULA:—TWO HORSES, AT 50s. TO TRAVEL TWENTY-FIVE MILES PER DAY; TO DRAW
IN DRAYS 1½ YARDS PER LOAD; AND ON TRAMWAY, 10 YARDS PER TRIP.
| Cubic Yards. | Per Horse. | Per Tramway. |
|---|---|---|
| 609½ | From Town Belt to 1st mile post, 36 chains pitching metal... | From Town Belt to 1st mile post, 36 chains pitching metal... |
| 451½ | " 2nd " | " 2nd " |
| 1585 | " 3rd, pitching ... | " 3rd, pitching ... |
| 1589 | " 4th, pitching ... | " 4th, pitching ... |
| 1566 | " 5th, pitching ... | " 5th, pitching ... |
| 1565 | " 6th, pitching ... | " 6th, pitching ... |
| 1589 | " " to Maris Bridge, pitching | " " to Maris Bridge, pitching |
| 724 | metal. | metal. |
| 642½ | ... | ... |
| £8,406 3 6 | £1,017 4 7½ |
333
Next Page →
✨ LLM interpretation of page content
🏗️
Estimate for Pitching and Metalling the Napier Road
(continued from previous page)
🏗️ Infrastructure & Public WorksRoad construction, Pitching, Metalling, Cost estimate, Napier Road, Maris Bridge
Southland Provincial Gazette 1863, No 62