Road Construction Costs




SCHEDULE.

SHOWING THE COST OF CONVEYING MATERIALS FROM INTERMEDIATE DEPOT FOR CON-
STRUCTION OF NAPIER ROAD FROM THE TOWN BELT TO MARIS BRIDGE. THE COST
OF LEAVING THE MATERIALS HAS BEEN CALCULATED FROM THE FOLLOWING
FORMULA:—TWO HORSES, AT 50s. TO TRAVEL TWENTY-FIVE MILES PER DAY; TO DRAW
IN DRAYS 1½ YARDS PER LOAD; AND ON TRAMWAY, 10 YARDS PER TRIP.

Cubic Yards. Per Horse. Per Tramway.
609½ From Town Belt to 1st mile post, 36 chains pitching metal... From Town Belt to 1st mile post, 36 chains pitching metal...
451½ " 2nd " " 2nd "
1585 " 3rd, pitching ... " 3rd, pitching ...
1589 " 4th, pitching ... " 4th, pitching ...
1566 " 5th, pitching ... " 5th, pitching ...
1565 " 6th, pitching ... " 6th, pitching ...
1589 " " to Maris Bridge, pitching " " to Maris Bridge, pitching
724 metal. metal.
642½ ... ...
£8,406 3 6 £1,017 4 7½

333



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF Southland Provincial Gazette 1863, No 62





✨ LLM interpretation of page content

🏗️ Estimate for Pitching and Metalling the Napier Road (continued from previous page)

🏗️ Infrastructure & Public Works
Road construction, Pitching, Metalling, Cost estimate, Napier Road, Maris Bridge