ESTIMATE OF THE COST OF CONSTRUCTING A TRAMWAY FOR THE CONVEYANCE OF MATERIAL FOR THE CONSTRUCTION OF THE EAST OR MATAURA ROAD.
Note.—It is proposed to lay the tramway on the water table along the side of roadway.
- Rails, 3 x 4
- Sleepers, 3 feet apart, 22 per chain
- Notching sleepers, making keys, 32 No.
- Laying road per chain
- Formation throughout
- Total cost per mile .................................................................. £874 0 0
SCHEDULE,
SHOWING THE COST OF CONVEYING MATERIALS FROM INVERCARGILL JETTY, FOR CONSTRUCTION OF MATAURA ROAD FROM MAVIS BRIDGE, WAIOPAI RIVER, AS FAR AS THE 15th MILE POST, NEAR DACRE. CALCULATED FROM THE FOLLOWING FORMULA — TWO HORSES, AT 50s., TO TRAVEL 25 MILES PER DAY; TO DRAW IN TRAMS 10 YARDS PER TRIP —
| Description | Cubic Yards |
|---|---|
| From Mavis Bridge to 6th Mile Post | Pitching 841 |
| Metal 746 | |
| 6th Mile Post to 7th | Pitching 1565 |
| Metal 1389 | |
| 7th Mile Post to 8th | Pitching 1565 |
| Metal 1389 | |
| 8th Mile Post to 9th | Pitching 1565 |
| Metal 1389 | |
| 9th Mile Post to 10th | Pitching 1686 |
| Metal 1389 | |
| 10th Mile Post to 11th | Pitching 1565 |
| Metal 1389 | |
| 11th Mile Post to 12th | Pitching 1686 |
| Metal 1389 | |
| 12th Mile Post to 13th | Pitching 1565 |
| Metal 1389 | |
| 13th Mile Post to 14th | Pitching 1565 |
| Metal 1389 | |
| 14th Mile Post to 15th | Pitching 1565 |
| Metal 1389 |
Total .......................... 64,346.5 44
Next Page →
✨ LLM interpretation of page content
🏗️
Estimate for Constructing a Tramway for East Road Material Conveyance
(continued from previous page)
🏗️ Infrastructure & Public WorksTramway construction, Material conveyance, East Road, Cost estimate, Rails, Sleepers, Formation
🏗️ Schedule of Material Conveyance Costs for Mataura Road
🏗️ Infrastructure & Public WorksMaterial conveyance, Cost schedule, Mataura Road, Pitching, Metal, Mavis Bridge, Waipai River
Southland Provincial Gazette 1863, No 62