ESTIMATE OF COST OF CONSTRUCTING ROAD FROM CLARK’S CROSSING
TO THE ORETI RIVER, SHOULD THE MATERIAL BE OBTAINED
FROM THE MOKOMOKO.
NOTE.—The formation and ditching are now under contract.
Quarrying 1699 yards rubble ...
Quarrying and breaking 1508 yards metal ...
Conveying material from Mokomoko, 3207 cubic yards ...
Carting 3207 yards stone ... £2,691 3 8
Discharging and filling 3207 yards ...
Setting 1699 yards pitchers ...
Spreading 1508 yards metal ...
If road be gravelled, I estimate the cost—
800 chains of gravelling, same to be thoroughly screened ... £1,042 8 9
The road beyond Oreti River to Mitchel’s is now under contract.
ESTIMATE OF THE COST OF MAKING VIABLE THE ROAD FROM
RIVERTON TO THE OTOUTOU.
1st Bridge from Riverton. Approaches require to be made up and gravelled
for six chains ...
2nd Bridge. Approaches, 10 chains, require to be reformed and gravelled ...
About 10 chains on the made road, near river, to be made up and gravelled ... £2,228 0 0
Approaches on both sides of Aparima River—about sixty chains in all—require
to be reformed, pitched, and gravelled. The material can be brought up
in punts, and discharged near bridge ...
At Gummie’s Bush, 12 chains forming, ditching, and gravelling ...
The road from Gummie’s Bush to the Otoutou is now under contract; Messrs.
Jamieson and Cameron having it as far as Mount Pleasant, and Messrs. M’Neil and
Wilson from there to the Otoutou.
Next Page →
✨ LLM interpretation of page content
🏗️
Estimate for Road Construction from Clark’s Crossing to the Oreti River
(continued from previous page)
🏗️ Infrastructure & Public WorksRoad construction, Quarrying, Metal, Ditching, Clark’s Crossing, Oreti River, Mokomoko
🏗️ Estimate for Making Viable the Road from Riverton to the Otoutou
🏗️ Infrastructure & Public WorksRoad construction, Bridges, Gravelling, Aparima River, Riverton, Otoutou, Gummie’s Bush
Southland Provincial Gazette 1863, No 62