ESTIMATE OF THE COST OF CONSTRUCTING THE BAY ROAD COM-
MENCING AT ITS JUNCTION WITH NORTH ROAD NEAR THE
WAIOPAI BRIDGE, AND EXTENDING A DISTANCE OF 189.80 CHAINS,
AS FAR AS THE CORDUROY ROAD WHICH IS NOW BEING CON-
STRUCTED THROUGH THE WAIAUWI BUSH.

Note.β€”It would under any circumstances be necessary to raise the present road,
and this may be done by widening and deepening the drains. It would also be advisable
to pitch and metal this road, as the material can be brought down from the Mokomoko
to the side of road by cutting outlet drains wider and deeper.

Widening drains and re-forming 189.80 chains .....................................
Excavating outlets and trimming culverts galore ................................
Quarrying and breaking 3378 yards metal .......................................
Conveying from Mokomoko to roadside with punts
Discharging punts, 6971 yards ................................................
Setting 3378 yards pitchers ................................................
Spreading 3378 yards metal .....................................................

46,548 0 0



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF Southland Provincial Gazette 1863, No 62





✨ LLM interpretation of page content

πŸ—οΈ Estimate for Bay Road Construction (continued from previous page)

πŸ—οΈ Infrastructure & Public Works
Road construction, Drainage, Metalling, Culverts, Bay Road, Waiauwi Bush, Mokomoko