ESTIMATE OF THE COST OF CONSTRUCTING 132 CHAINS 45 LINKS OF ROADWAY, NEAR THE ORETI RIVER (TOGETHER WITH THE NECESSARY BRIDGES, CULVERTS, &c.) ON THE RIVERTON ROAD VIA WALLACETOWN.
96·50 chains of formation and ditching, including the necessary embankments (swampy ground)
36·95 chains of formation and ditching (on high ground)
One bridge, having a span of 39 feet in the clear, constructed of two bays, 19 feet each clear
One bridge, having a span of 34 feet in the clear, constructed of two bays, 17 feet each clear
One culvert, 41 feet in length, 3 feet by 2 feet
132·45 chains gravelling, to be thoroughly cleaned (and taken from the Oreti River), and laid on the road 14 feet wide by 9 inches in depth, equal to 25 yards 18 feet cube per chain, with an average lead of 66·23 chains, requiring a total quantity of 3,335 cubic yards.
Next Page →
✨ LLM interpretation of page content
🏗️
Estimate for Wallacetown and Riverton Road Construction
(continued from previous page)
🏗️ Infrastructure & Public WorksRoad construction, Drainage, Gravelling, Culverts, Bridges, Wallacetown, Riverton, Oreti River
Southland Provincial Gazette 1863, No 62