✨ Electricity Easement Details
NEW ZEALAND GAZETTE, No. 77 — 1 SEPTEMBER 2016
Southland Land District—Gore District
First Schedule
a. Part Lot 2 DP 308123 (Computer Freehold Register 31568); marked "A", "B" and "D" on SO 476170; and
b. Part Lot 1 DP 15356 (Computer Freehold Register 31568); marked "C" on SO 476170.
Second Schedule
Rights, Powers, Terms, Covenants, Conditions and Restrictions Included in the Easement ("Easement")
1. Use of Defined Terms
1.1 Capitalised terms used throughout this Easement are defined in clause 12.
1.2 In this Easement, references to "Landowner" are references to the registered owner for the time being of the Land (or any part of the Land) and include:
a. the registered owner at the date of this Easement and that person’s successors in title; and
b. where appropriate, the employees, contractors, agents, tenants and invitees of the registered owner of the Land (or any part of the Land).
1.3 In this Easement, references to "Transpower" are references to the holder for the time being of the Easement and include:
a. Transpower New Zealand Limited and its transferees and successors;
b. any subsidiary or related companies of the holder of the Easement; and
c. where appropriate, the employees, contractors, agents and invitees of the holder of the Easement.
2. Transpower’s Rights
2.1 This Easement gives Transpower the following rights:
a. To construct, install, inspect, operate, repair, maintain, renew, replace, upgrade, add to, modify and remove the Line or any part of the Line on the Easement Area;
b. to convey, conduct, send, distribute, pass, convert, transport, transmit and receive electricity by means of the Line;
c. to undertake any tests, investigations, surveys and ancillary works (including the temporary or permanent relocation (including by replacement) of any cables, lines and pipes) to exercise Transpower’s rights and obligations under this Easement;
d. to enter, from any reasonable location, and remain on the Easement Area and the Accessway with or without Vehicles and Equipment for so long as is reasonably necessary to exercise Transpower’s rights and obligations under this Easement;
e. to enter, from any reasonable location, and remain on parts of the Land outside the Easement Area and the Accessway with or without Vehicles and Equipment to exercise Transpower’s rights and obligations under this Easement, but only if:
i. the Accessway is not available for any reason; or
ii. access to and from the Easement Area is by air; or
iii. Transpower reasonably needs to have access outside the Easement Area and the Accessway to exercise any of Transpower’s rights under this Easement;
and then Transpower may use any reasonable access route to exercise Transpower’s rights and obligations;
f. to construct, inspect, repair, maintain, renew, remove and modify fences (including boundary fences) on the Land and to install gates within fences to exercise Transpower’s rights and obligations under this Easement or for electrical safety purposes;
g. to use any gates that Transpower installs under clause 2.1(f) and to lock any of those gates if they are boundary gates, but only if Transpower gives the Landowner a means of access through each locked gate unless a gate leads directly onto private property that the Landowner does not own;
h. to construct, inspect, use, repair, maintain, renew, upgrade, remove and modify access tracks (including
Next Page →
✨ LLM interpretation of page content
🗺️
Electricity Easement in Gross Taken — GOR–TEE A Transmission Line Project, Gore District
(continued from previous page)
🗺️ Lands, Settlement & Survey18 August 2016
Electricity Easement, Transmission Line, Gore District, Transpower, Rights, Obligations, Access Tracks, Notices, Land Use Obligations
NZ Gazette 2016, No 77