✨ Performance Measures




31 AUGUST 2005
NEW ZEALAND GAZETTE, No. 150
3689

Scanpower Limited
Performance Measures Continued
For the Year Ended 31 March 2005

Line Voltage / Target 2006 2006/2010
11kV 8.00 8.00

Sub Requirement 6.
Faults per 100 Circuit Kilometres (Underground)

Line Voltage 2005 2004 2003 2002 2001
11kV Underground 0 0 0 0 0

Sub Requirement 7.
Faults per 100 Circuit Kilometres (Overhead)

Line Voltage 2005 2004 2003 2002 2001
11kV Overhead 8.04 17.27 5.59 8.58 9.42

Sub Requirement 8. 9. 10. 11.
SAIDI Results by Class and Targets

Class A B C D E F G TOTAL
2005 SAIDI 0.00 38.82 32.49 0.00 0.00 0.00 0.00 71.31
2004 SAIDI 0.00 33.96 151.24 0.00 0.00 0.00 0.00 185.20
2003 SAIDI 28.44 24.80 57.23 0.00 0.00 0.00 0.00 110.47
2002 SAIDI 0.00 40.87 29.34 0.00 0.00 0.00 0.00 70.21
Class / Target 2006 2006/2010
SAIDI Class B 30.00 30.00
SAIDI Class C 45.00 45.00

Sub Requirement 12. 13. 14. 15.
SAIFI Results by Class and Targets

Class A B C D E F G TOTAL
2005 SAIFI 0.00 0.29 0.54 0.00 0.00 0.00 0.00 0.83
2004 SAIFI 0.00 0.26 1.41 0.00 0.00 0.00 0.00 1.67
2003 SAIFI 0.24 0.18 0.56 0.00 0.00 0.00 0.00 0.98
2002 SAIFI 0.00 0.31 0.55 0.00 0.00 0.00 0.00 0.86
Class / Target 2006 2006/2010
SAIFI Class B 0.25 0.25
SAIFI Class C 0.60 0.60


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2005, No 150


Gazette.govt.nz PDF NZ Gazette 2005, No 150





✨ LLM interpretation of page content

🏭 Scanpower Limited Performance Measures (continued from previous page)

🏭 Trade, Customs & Industry
Financial Performance, Energy Efficiency, Return on Funds, Return on Equity, Return on Investments, Direct Line Cost, Indirect Line Cost, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Circuit Length, Transformer Capacity, Maximum Demand, Electricity Supply, Faults per 100 Circuit Kilometres, SAIDI, SAIFI