NEW ZEALAND GAZETTE, No. 150
3689
Scanpower Limited
Performance Measures Continued
For the Year Ended 31 March 2005
| Line Voltage / Target | 2006 | 2006/2010 |
|---|---|---|
| 11kV | 8.00 | 8.00 |
Sub Requirement 6.
Faults per 100 Circuit Kilometres (Underground)
| Line Voltage | 2005 | 2004 | 2003 | 2002 | 2001 |
|---|---|---|---|---|---|
| 11kV Underground | 0 | 0 | 0 | 0 | 0 |
Sub Requirement 7.
Faults per 100 Circuit Kilometres (Overhead)
| Line Voltage | 2005 | 2004 | 2003 | 2002 | 2001 |
|---|---|---|---|---|---|
| 11kV Overhead | 8.04 | 17.27 | 5.59 | 8.58 | 9.42 |
Sub Requirement 8. 9. 10. 11.
SAIDI Results by Class and Targets
| Class | A | B | C | D | E | F | G | TOTAL |
|---|---|---|---|---|---|---|---|---|
| 2005 SAIDI | 0.00 | 38.82 | 32.49 | 0.00 | 0.00 | 0.00 | 0.00 | 71.31 |
| 2004 SAIDI | 0.00 | 33.96 | 151.24 | 0.00 | 0.00 | 0.00 | 0.00 | 185.20 |
| 2003 SAIDI | 28.44 | 24.80 | 57.23 | 0.00 | 0.00 | 0.00 | 0.00 | 110.47 |
| 2002 SAIDI | 0.00 | 40.87 | 29.34 | 0.00 | 0.00 | 0.00 | 0.00 | 70.21 |
| Class / Target | 2006 | 2006/2010 |
|---|---|---|
| SAIDI Class B | 30.00 | 30.00 |
| SAIDI Class C | 45.00 | 45.00 |
Sub Requirement 12. 13. 14. 15.
SAIFI Results by Class and Targets
| Class | A | B | C | D | E | F | G | TOTAL |
|---|---|---|---|---|---|---|---|---|
| 2005 SAIFI | 0.00 | 0.29 | 0.54 | 0.00 | 0.00 | 0.00 | 0.00 | 0.83 |
| 2004 SAIFI | 0.00 | 0.26 | 1.41 | 0.00 | 0.00 | 0.00 | 0.00 | 1.67 |
| 2003 SAIFI | 0.24 | 0.18 | 0.56 | 0.00 | 0.00 | 0.00 | 0.00 | 0.98 |
| 2002 SAIFI | 0.00 | 0.31 | 0.55 | 0.00 | 0.00 | 0.00 | 0.00 | 0.86 |
| Class / Target | 2006 | 2006/2010 |
|---|---|---|
| SAIFI Class B | 0.25 | 0.25 |
| SAIFI Class C | 0.60 | 0.60 |
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2005, No 150
Gazette.govt.nz —
NZ Gazette 2005, No 150
β¨ LLM interpretation of page content
π
Scanpower Limited Performance Measures
(continued from previous page)
π Trade, Customs & IndustryFinancial Performance, Energy Efficiency, Return on Funds, Return on Equity, Return on Investments, Direct Line Cost, Indirect Line Cost, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Circuit Length, Transformer Capacity, Maximum Demand, Electricity Supply, Faults per 100 Circuit Kilometres, SAIDI, SAIFI