β¨ Scanpower Limited Performance Measures
Scanpower Limited
Performance Measures Continued
For the Year Ended 31 March 2005
Ref
Description
2005
2004
2003
2002
2001
Retailer 6
0
0
0
90,095
237
Retailer 7
0
0
0
0
1,346,470
Total
91,319,985
86,686,126
86,625,250
82,456,432
81,083,211
2 h | Total Consumers (Average for the Year) | 6,753 | 6,719 | 6,638 | 6,615 | 6,707 |
Part 5. Requirement 21 (Reliability Performance Measures)
Sub Requirement 1.
Total Number of Interruptions by Class
Year
A
B
C
D
E
F
G
TOTAL
Total Interruptions 2005
0.00
86.00
60.00
0.00
0.00
0.00
0.00
146.00
Total Interruptions 2004
0.00
97.00
129.00
0.00
0.00
0.00
0.00
226.00
Total Interruptions 2003
1.00
82.00
65.00
0.00
0.00
0.00
0.00
148.00
Total Interruptions 2002
1.00
102.00
65.00
1.00
0.00
0.00
0.00
169.00
Total Interruptions 2001
0.00
116.00
72.00
0.00
0.00
0.00
0.00
188.00
Sub Requirement 2. (a) & (b)
Interruption Targets for the Following Year
Target Description
2006
2005
2004
2003
2002
Planned Interruption Target (Class B)
80
100
90
100
150
Unplanned Interruption Target (Class C)
60
62
70
100
150
Sub Requirement 3.
Average Interruption Targets for the Following and Subsequent 4 years
Target Description
2006/2010
2005/2009
2004/2008
2003/2007
2002/2006
Planned Interruption Target (Class B)
80
100
90
100
150
Unplanned Interruption Target (Class C)
60
62
70
100
150
Sub Requirement 4. (a) & (b)
Percentage Proportion of Total Number of Class C Interruptions by Time
Restoration Time
2005
2004
2003
2002
2001
3 Hours
6.7%
32.6%
18.8%
4.6%
21.0%
24 Hours
0.0%
3.9%
0.0%
0.0%
0.0%
Sub Requirement 5. (a) (b) (c) & (d)
Faults per 100 Circuit Kilometres (Actual and Target)
Line Voltage
2005
2004
2003
2002
2001
11kV
8.04
17.27
8.58
8.58
9.42
LexisNexis
Next Page →
Online Sources for this page:
β¨ LLM interpretation of page content
π
Scanpower Limited Performance Measures
(continued from previous page)
Domain π Trade, Customs & Industry
Keywords Financial Performance, Energy Efficiency, Return on Funds, Return on Equity, Return on Investments, Direct Line Cost, Indirect Line Cost, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Circuit Length, Transformer Capacity, Maximum Demand, Electricity Supply