✨ Scanpower Limited Performance Measures




Scanpower Limited

Performance Measures Continued

For the Year Ended 31 March 2005

Ref Description 2005 2004 2003 2002 2001
Retailer 6 0 0 0 90,095 237
Retailer 7 0 0 0 0 1,346,470
Total 91,319,985 86,686,126 86,625,250 82,456,432 81,083,211

2 h | Total Consumers (Average for the Year) | 6,753 | 6,719 | 6,638 | 6,615 | 6,707 |

Part 5. Requirement 21 (Reliability Performance Measures)

Sub Requirement 1.

Total Number of Interruptions by Class

Year A B C D E F G TOTAL
Total Interruptions 2005 0.00 86.00 60.00 0.00 0.00 0.00 0.00 146.00
Total Interruptions 2004 0.00 97.00 129.00 0.00 0.00 0.00 0.00 226.00
Total Interruptions 2003 1.00 82.00 65.00 0.00 0.00 0.00 0.00 148.00
Total Interruptions 2002 1.00 102.00 65.00 1.00 0.00 0.00 0.00 169.00
Total Interruptions 2001 0.00 116.00 72.00 0.00 0.00 0.00 0.00 188.00

Sub Requirement 2. (a) & (b)

Interruption Targets for the Following Year

Target Description 2006 2005 2004 2003 2002
Planned Interruption Target (Class B) 80 100 90 100 150
Unplanned Interruption Target (Class C) 60 62 70 100 150

Sub Requirement 3.

Average Interruption Targets for the Following and Subsequent 4 years

Target Description 2006/2010 2005/2009 2004/2008 2003/2007 2002/2006
Planned Interruption Target (Class B) 80 100 90 100 150
Unplanned Interruption Target (Class C) 60 62 70 100 150

Sub Requirement 4. (a) & (b)

Percentage Proportion of Total Number of Class C Interruptions by Time

Restoration Time 2005 2004 2003 2002 2001
3 Hours 6.7% 32.6% 18.8% 4.6% 21.0%
24 Hours 0.0% 3.9% 0.0% 0.0% 0.0%

Sub Requirement 5. (a) (b) (c) & (d)

Faults per 100 Circuit Kilometres (Actual and Target)

Line Voltage 2005 2004 2003 2002 2001
11kV 8.04 17.27 8.58 8.58 9.42

LexisNexis



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2005, No 150


Gazette.govt.nz PDF NZ Gazette 2005, No 150





✨ LLM interpretation of page content

🏭 Scanpower Limited Performance Measures (continued from previous page)

🏭 Trade, Customs & Industry
Financial Performance, Energy Efficiency, Return on Funds, Return on Equity, Return on Investments, Direct Line Cost, Indirect Line Cost, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Circuit Length, Transformer Capacity, Maximum Demand, Electricity Supply