✨ Performance Measures




Scanpower Limited

Performance Measures Continued

For the Year Ended 31 March 2005


Sub Requirement 16, 17, 18.19. CAIDI Results by Class and Targets

Class A B C D E F G TOTAL
2005 CAIDI 0.00 133.86 60.17 0.00 0.00 0.00 0.00 85.92
2004 CAIDI 0.00 130.62 107.26 0.00 0.00 0.00 0.00 110.90
2003 CAIDI 118.50 137.77 102.20 0.00 0.00 0.00 0.00 112.72
2002 CAIDI 239.83 131.07 48.15 29.82 0.00 0.00 0.00 85.63
2001 CAIDI 0.00 133.13 53.14 0.00 0.00 0.00 0.00 81.64
Class / Target 2006 2006/2010
CAIDI Class B 120.00 120.00
CAIDI Class C 75.00 75.00


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2005, No 150


Gazette.govt.nz PDF NZ Gazette 2005, No 150





✨ LLM interpretation of page content

🏭 Scanpower Limited Performance Measures (continued from previous page)

🏭 Trade, Customs & Industry
Financial Performance, Energy Efficiency, Return on Funds, Return on Equity, Return on Investments, Direct Line Cost, Indirect Line Cost, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Circuit Length, Transformer Capacity, Maximum Demand, Electricity Supply, Faults per 100 Circuit Kilometres, SAIDI, SAIFI, CAIDI, Performance Measures