HORIZON ENERGY DISTRIBUTION LIMITED
Requirement 21 Reliability Performance Measures (Continued)
For the year ended 31 March 2005
| 2005 | 2004 | 2003 | 2002 | |
|---|---|---|---|---|
| 6) Number of Faults per 100 km of Underground Prescribed Voltage Line | ||||
| 110 kV | - | - | - | - |
| 33 kV | 4.8 | 4.4 | 1.5 | 4.6 |
| 11 kV | ||||
| Total Underground Faults / 100km | 4.7 | 4.4 | 1.4 | 4.4 |
| 2005 | 2004 | 2003 | 2002 | |
|---|---|---|---|---|
| 7) Number of Faults per 100 km of Overhead Prescribed Voltage Line | ||||
| 110 kV | - | - | - | - |
| 33 kV | 4.0 | 0.6 | 0.6 | 1.7 |
| 11 kV | 7.2 | 5.0 | 5.0 | 3.4 |
| Total Overhead Faults / 100km | 6.9 | 4.6 | 4.6 | 3.3 |
8) SAIDI for Total Number of Interruptions
987 ②
219
192
258 ①
① 100 minutes related to Tornado November 2001
② Due to July 2004 flooding and other extreme weather events
| 2006 | 2005 | 2004 | 2003 | 2002 | |
|---|---|---|---|---|---|
| 9) SAIDI Targets (Next Year) | |||||
| (a) Planned interruptions (Class B) | 45 | 45 | 45 | 45 | 45 |
| (b) Unplanned interruptions (Class C) | 100 | 100 | 67 | 72 |
| 2006 | 2005 | 2004 | 2003 | 2002 | |
|---|---|---|---|---|---|
| 10) Average SAIDI Targets (Next 5 Years) | |||||
| (a) Planned interruptions (Class B) | 45 | 45 | 45 | 45 | 45 |
| (b) Unplanned interruptions (Class C) | 100 | 100 | 67 | 72 |
11) SAIDI for Total Interruptions by Class
Class A - Transpower planned interruptions
251
74
87
Class B - Horizon planned interruptions
22
25
20
35
Class C - Horizon unplanned interruptions
331
108
77
179
Class D - Transpower unplanned interruptions
372
12
8
44
Class E - Horizon generation unplanned interruptions
Class F - Other generation unplanned interruptions
Class G - Other line owner unplanned interruptions
11
Class H - Other line owner planned interruptions
Class I - Not in A to H
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2005, No 127
Gazette.govt.nz —
NZ Gazette 2005, No 127
✨ LLM interpretation of page content
🏭
Energy Delivery Efficiency Performance Measures for Horizon Energy Distribution Limited
(continued from previous page)