HORIZON ENERGY DISTRIBUTION LIMITED

Requirement 21 Reliability Performance Measures

For the year ended 31 March 2005

2005 2004 2003 2002
1) Interruptions
Class A - Transpower planned interruptions 8 1 2 -
Class B - Horizon planned interruptions 51 67 57 54
Class C - Horizon unplanned interruptions 125 83 80 61
Class D - Transpower unplanned interruptions 5 4 4 6
Class E - Horizon generation unplanned interruptions 0 - - -
Class F - Other generation unplanned interruptions 2 - - 1
Class G - Other line owner unplanned interruptions 1 - - -
Class H - Other line owner planned interruptions - - - -
Class I - Not in A to H - - - -
Total Number of interruptions 192 155 143 122
Interruption Targets (Next Year) 2006 2005 2004 2003 2002
2)
(a) Planned interruptions (Class B) 62 62 80 80 110
(b) Unplanned interruptions (Class C) 82 82 85 75 80
Average Interruption Targets (Next 5 Years) 2006 2005 2004 2003 2002
3)
(a) Planned interruptions (Class B) 62 62 80 80 110
(b) Unplanned interruptions (Class C) 82 82 85 75 80
2005 2004 2003 2002
4) Proportion of Class C interruptions not restored within
(a) 3 hours 33.60% 14.46% 15.00% 10.7%
(b) 24 hours 8.80% 0.00% 0.00% 0.00%
Faults per 100 km of prescribed voltage line 2005 2004 2003 2002
5)
(a) Number of faults
110 kV 3.9 0.6 0.6 1.7
33 kV 0 - - -
11 kV 7.0 4.9 4.7 3.5
Total Number of Faults 6.7 4.6 4.3 3.3
2006 2005 2004 2003 2002
(b) Number of Faults Targeted
110 kV - - - 1.1 1.1
33 kV - - - - -
11 kV 4.9 4.8 5.1 4.4 4.8
Total Number of Faults Targeted 4.4 4.5 4.6 4.1 4.4
(c) Average Number of Faults Targeted (Next 5 Yrs) 2006 2005 2004 2003 2002
110 kV - - - 1.1 1.1
33 kV - - - - -
11 kV 4.9 4.9 5.1 4.4 4.8
Total Average Number of Faults Targeted 4.4 4.5 4.6 4.1 4.4


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2005, No 127


Gazette.govt.nz PDF NZ Gazette 2005, No 127





✨ LLM interpretation of page content

🏭 Energy Delivery Efficiency Performance Measures for Horizon Energy Distribution Limited (continued from previous page)

🏭 Trade, Customs & Industry
17 August 2005
Energy Delivery, Efficiency, Performance Measures, Electricity, Horizon Energy