✨ Electricity Reliability Performance Measures
230 NEW ZEALAND GAZETTE, No. 10 17 JANUARY 2005
- The total number of faults per 100 circuit kilometres of overhead prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
| Lines | Cable | Total | |
|---|---|---|---|
| Nominal Voltage | Faults per 100 km | Faults per 100 km | Faults per 100 km |
| 33 kV | 4.03 | 0.00 | 4.00 |
| 11 kV | 2.03 | 1.45 | 2.01 |
| TOTALS | 2.19 | 1.42 | 2.18 |
| Faults/100km | Faults/100km 33kV | Faults/100km 11kV | |
|---|---|---|---|
| Target 31/03/2005 | 2.02 | 1.6 | 2.00 |
| 31/03/2005 Avg forecast | 2.07 | 1.8 | 2.07 |
| 31/03/2006 Avg forecast | 2.02 | 1.3 | 2.00 |
| 31/03/2007 Avg forecast | 1.99 | 1.3 | 1.98 |
| 31/03/2008 Avg forecast | 1.94 | 1.0 | 1.95 |
| 31/03/2009 Avg forecast | 1.94 | 1.0 | 1.95 |
8, 12, 16. The SAIDI, SAIFI, CAIDI for the total number of interruptions.
9, 13, 17. SAIDI targets for the following financial year for-
(a) Planned interruptions by the disclosing entity (Class B); and
(b) Unplanned interruptions originating within the works of the disclosing entity (Class C).
10, 14, 18. Average SAIDI targets for the following financial year and the subsequent 4 financial years for each of-
(a) Planned interruptions by the disclosing entity (Class B); and
(b) Unplanned interruptions originating within the works of the disclosing entity (Class C).
11, 15, 19. The SAIDI for the total number of interruptions within each interruption class.
| NETWORK OR GENERATION OWNER | Dise Reg Class | CLASSIFICATION OF INTERRUPTIONS | SAIDI | SAIFI | CAIDI |
| | | | Numerator (Cust·min) | Result (min/Cust) | Numerator (Cust·int) | Result (int/Cust) | Result (min/Cust·int) |
|-----------------------------|-----------------|--------------------------------|---------------------|----------------------|------------------------|--------------------|-------------------------|
| MainPower | B | Planned Shut-downs | 1,410,024 | 48.59 | 6,126 | 0.21 | 230.17 |
| | C + G | Unplanned Interruptions | 1,318,724 | 45.45 | 27,760 | 0.96 | 47.50 |
| | | Subtotal | 2,728,748 | 94.04 | 33,886 | 1.17 | 80.53 |
| TransPower | A | Planned Shut-downs | 0 | 0.00 | 0 | 0.00 | 0.00 |
| | D | Unplanned Interruptions | 162,448 | 5.60 | 1,136 | 0.04 | 143.00 |
| | | Subtotal | 162,448 | 5.60 | 1,136 | 0.04 | 143.00 |
| Other | G | Other Interruptions | 0 | 0.00 | 0 | 0.00 | 0.00 |
| ECNZ | F | Unplanned Interruptions | 0 | 0.00 | 0 | 0.00 | 0.00 |
| | | Subtotal | 0 | 0.00 | 0 | 0.00 | 0.00 |
| | | TOTAL | 2,891,196 | 99.64 | 35,022 | 1.21 | 82.55 |
Common Denominator | No. of Cust. | 29,018
| Class B | SAIDI | SAIFI | CAIDI |
|---|---|---|---|
| Target 31/03/2005 | 54 | 0.26 | 207 |
| 31/03/2005 Avg forecast | 56 | 0.28 | 200 |
| 31/03/2006 Avg forecast | 54 | 0.24 | 225 |
| 31/03/2007 Avg forecast | 52 | 0.24 | 216 |
| 31/03/2008 Avg forecast | 50 | 0.23 | 217 |
| 31/03/2009 Avg forecast | 50 | 0.23 | 217 |
| Class C | SAIDI | SAIFI | CAIDI |
|---|---|---|---|
| Target 31/03/05 | 52 | 1.04 | 50.0 |
| 31/03/2005 Avg forecast | 54 | 1.07 | 50.5 |
| 31/03/2006 Avg forecast | 51 | 1.00 | 51.0 |
| 31/03/2007 Avg forecast | 50 | 0.98 | 51.0 |
| 31/03/2008 Avg forecast | 49 | 0.97 | 50.5 |
| 31/03/2009 Avg forecast | 49 | 0.97 | 50.5 |
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2005, No 10
Gazette.govt.nz —
NZ Gazette 2005, No 10
✨ LLM interpretation of page content
🏭
Disclosure of Reliability Performance Measures
(continued from previous page)
🏭 Trade, Customs & IndustryReliability Performance, Interruptions, Electricity, MainPower, TransPower, ECNZ