β¨ Reliability Performance Measures
MAINPOWER NEW ZEALAND LTD
DISCLOSURE OF RELIABILITY PERFORMANCE MEASURES
PURSUANT TO THE COMMERCE ACT (ELECTRICITY INFORMATION DISCLOSURE REQUIREMENTS) NOTICE 2004, REQUIREMENT 21, PART 4.
Requirement 21 (1)
- Total number of interruptions, together with a breakdown of that total according to interruption class.
| NETWORK OR GENERATION OWNER | Disc Reg Class | CLASSIFICATION of INTERRUPTIONS |
|---|---|---|
| MainPower | B | Planned Shut-downs |
| C - G | Unplanned Interruptions | |
| Subtotal | ||
| Trans Power | A | Planned Shut-downs |
| D | Unplanned Interruptions | |
| Subtotal | ||
| Other | G | Other Interruptions |
| ECNZ | E | Unplanned Interruptions |
| Subtotal | ||
| TOTAL |
-
Interruption targets for the following financial year for-
(a) Planned interruptions by the disclosing entity (Class B), and
(b) Unplanned interruptions originating within the works of the disclosing entity (Class C). -
Average interruption targets for the following financial year and the subsequent 4 financial years for each of-
(a) Planned interruptions by the disclosing entity (Class B); and
(b) Unplanned interruptions originating within the works of the disclosing entity (Class C).
| Class B Interruptions | Class C Interruptions | |
|---|---|---|
| Target 31/03/2005 | 180 | 75 |
| 31/03/2005 Avg forecast | 182 | 77 |
| 31/03/2006 Avg forecast | 165 | 75 |
| 31/03/2007 Avg forecast | 160 | 74 |
| 31/03/2008 Avg forecast | 155 | 72 |
| 31/03/2009 Avg forecast | 155 | 72 |
- The proportion (expressed as a percentage) of the total number of Class C interruptions not restored within-
(a) 3 hours; and
(b) 24 hours.
| Not restored within 3 hours- % of Class C | Not restored within 24 hours- % of Class C |
|---|---|
| 7.3% | 1.2% |
-
With respect to faults per 100 circuit kilometers of prescribed voltage electric line, the following information:
(a) The total number of faults; and
(b) The total number of faults targeted for the following financial year; and
(c) The average total number of faults for that financial year and the subsequent 4 financial years; and
(d) A breakdown of the fault information in accordance with paragraphs (a) to (c) by different nominal line voltages. -
The total number of faults per 100 circuit kilometers of underground prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2005, No 10
Gazette.govt.nz —
NZ Gazette 2005, No 10
β¨ LLM interpretation of page content
π
Disclosure of Reliability Performance Measures
(continued from previous page)
π Trade, Customs & IndustryReliability Performance, Interruptions, Electricity, MainPower, Trans Power, ECNZ