Schedule 1 Part 5 Reliability Performance Measures to be Disclosed by Line Owners Other Than Transpower

Faults per 100 km (Underground) 33 kV 11 kV TOTAL
8.9,10, 11
Actual 1999 Actual 2000 Actual 2001 Actual 2002 Target 2003 Target 2005 to 2007
TOTAL 2.96 1.34 2.42 3.61 - -
2.72 4.23 3.57 3.04
2.99 3.77 3.38

SAIDI

Planned outages TransPower Planned outages WEL Unplanned outages WEL Unplanned outages TransPower Unplanned Interruption FCNZ generator Unplanned Interruption other generator Other Interruption TOTAL
Class A - 5.05 4.35 4.00 - - - 5.05
Class B - - 106.83 63.34 - - - 132.27
Class C - - 26.56 70.00 - - - 47.29
Class D - 5.02 5.02 - - - - 5.02
Class E - - - - - - - -
Class F - - - - - - - -
Class G - - - - - 184.61 -
TOTAL - - - - - - 76.21 116.21
157.67 184.61


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2002, No 118


Gazette.govt.nz PDF NZ Gazette 2002, No 118





✨ LLM interpretation of page content

🏭 Statement of Performance Measures for WEL Networks Limited (continued from previous page)

🏭 Trade, Customs & Industry
Energy delivery, Efficiency measures, Load factor, Loss ratio, Capacity utilization, Circuit km, Transformer capacity, Maximum demand, Electricity supply, Customers