Total Interruptions
Class A Planned outages TransPower Class B Planned outages WEL Class C Unplanned outages WEL Class D Unplanned outages TransPower Class E Unplanned Interruption FCNZ Class F Unplanned Interruption other generator Class G Other Interruption
Actual 1999 - - 46 5 - - -
Actual 2000 - - 50 195 2 - -
Actual 2001 - - 118 207 2 - -
Actual 2002 - - 74 202 - - -
Target 2003 30 - - 165 - - -
Target 2003 to 2007 27 - - 140 - - -

4

Class C interruptions not restored within 3 hours Class C interruptions not restored within 24 hours
Faults per 100 km (Total)
33 kV
Actual 1999 20.9%
Actual 2000 14.4%
Actual 2001 15.0%
Actual 2002 23.3%
Target 2003 -
Target 2003 to 2007 -

6

| Faults per 100 km (Overhead) |
| --- | --- |
| | 33 kV | 11 kV | TOTAL |
| Actual 1999 | 2.04 | 12.60 | 11.62 |
| Actual 2000 | 8.67 | 8.40 | 8.35 |
| Actual 2001 | 3.01 | 8.60 | 7.92 |
| Actual 2002 | 1.54 | 8.61 | 8.02 |
| Target 2003 | - | - | -
| Target 2003 to 2007 | - | - | - |



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2002, No 118


Gazette.govt.nz PDF NZ Gazette 2002, No 118





✨ LLM interpretation of page content

🏭 Statement of Performance Measures for WEL Networks Limited (continued from previous page)

🏭 Trade, Customs & Industry
Energy delivery, Efficiency measures, Load factor, Loss ratio, Capacity utilization, Circuit km, Transformer capacity, Maximum demand, Electricity supply, Customers