✨ Reliability Performance Measures




3180

NEW ZEALAND GAZETTE

No. 118

Schedule 1 Part 5 Reliability Performance Measures to be Disclosed by Line Owners Other Than Transpower

12, 13, 14, 15 SAIFI

Target 2003 to 2007 Actual 2002 Actual 2001 Actual 2000 Actual 1999
Class A Planned outages TransPower 0.05 0.04 0.05 0.06 0.05
Class B Planned outages WEL 1.27 1.40 2.57 2.31 1.84
Class C Unplanned outages TransPower - - - - -
Class D Unplanned outages ECNZ - - - - -
Class E Unplanned Interruption other generator - - - - -
Class F Unplanned Interruption other - - - - -
Class G Other Interruption - - - - -
TOTAL 1.49 3.42 2.45 2.48 -

16, 17, 18, 19 CAIDI

Target 2003 to 2007 Actual 2002 Actual 2001 Actual 2000 Actual 1999
Class A Planned outages TransPower 80.00 - 82.74 78.15 94.71
Class B Planned outages WEL 50.00 - 49.41 46.25 71.97
Class C Unplanned outages TransPower - - - - -
Class D Unplanned outages ECNZ - - - - -
Class E Unplanned Interruption other generator - - - - -
Class F Unplanned Interruption other - - - - -
Class G Other Interruption - - - - -
TOTAL 51.15 46.10 47.52 80.07 74.39


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2002, No 118


Gazette.govt.nz PDF NZ Gazette 2002, No 118





✨ LLM interpretation of page content

🏭 Statement of Performance Measures for WEL Networks Limited (continued from previous page)

🏭 Trade, Customs & Industry
Energy delivery, Efficiency measures, Load factor, Loss ratio, Capacity utilization, Circuit km, Transformer capacity, Maximum demand, Electricity supply, Customers