Network Waitaki Limited (Lines)
Network Statistics - 31 March
| 2002 | 2001 | 2000 | 1999 | |
|---|---|---|---|---|
| Total System Length (kms) | ||||
| 33kV | 138.13 | 138.12 | 138.12 | 138.12 |
| 11kV | 1,554.33 | 1,543.61 | 1,538.00 | 1,530.01 |
| 230/400 V | 218.52 | 219.54 | 217.73 | 217.09 |
| Total | 1,910.98 | 1,901.27 | 1,893.85 | 1,885.22 |
| 2002 | 2001 | 2000 | 1999 | |
|---|---|---|---|---|
| Overhead Circuit Length (kms) | ||||
| 33kV | 137.85 | 137.84 | 137.84 | 137.84 |
| 11kV | 1,522.80 | 1,515.06 | 1,518.52 | 1,510.61 |
| 230/400 V | 192.36 | 193.37 | 187.53 | 187.57 |
| Total | 1,853.01 | 1,846.27 | 1,843.89 | 1,836.02 |
| 2002 | 2001 | 2000 | 1999 | |
|---|---|---|---|---|
| Underground Circuit Length (kms) | ||||
| 33kV | 0.28 | 0.28 | 0.28 | 0.28 |
| 11kV | 31.54 | 28.56 | 19.49 | 19.40 |
| 230/400 V | 26.16 | 26.17 | 30.20 | 29.52 |
| Total | 57.98 | 55.01 | 49.97 | 49.20 |
| 2002 | 2001 | 2000 | 1999 | |
|---|---|---|---|---|
| Transformer Capacity (kVA) | ||||
| 11,000/400V | 124,968 | 120,568 | 117,445 | 117,303 |
| 33,000/400V | 125 | 125 | 125 | 125 |
| Total | 125,113 | 120,693 | 117,570 | 117,428 |
| Maximum Demand (kW) | 29,026 | 31,356 | 28,824 | 30,024* |
| Total Electricity entering the Network- before losses (kWh) | 175,814,935 | 179,024,561 | 174,420,448 | 177,930,085* |
| Amount of electricity supplied from the system (kWh) | | | | |
| Retailer A | 134,961,945| 122,868,367 | 134,251,417 | 151,970,339 |
| Retailer B | 13,792,718 | 25,881,199 | 24,331,042 | 13,683,664 |
| Retailer C | 0 | 0 | 0 | 679,530^ |
| Retailer D | 0 | 0 | 0 | 1,156,898^ |
| Retailer E | 10,695,532 | 10,429,825 | 3,056,287 | 98,064^ |
| Retailer F | 3,616,764 | 5,319,863 | 2,627,240^ | 0 |
| Retailer G | 1,120,555 | 755,202 | 94,003^ | 0 |
| Retailer H | 387,442 | 7,238^ | 0 | 0 |
| Total | 164,574,956 | 165,261,694 | 164,359,989 | 167,588,545 |
| Total number of Consumers | Number | 11,341 | 11,372 | 11,409 | 11,385** |
- Demand and usage levels have been re-stated based on actual metered amounts.
** Number of Consumers has been re-stated to exclude sites that were de-energised.
^ Restated to exclude losses.
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2002, No 106
Gazette.govt.nz —
NZ Gazette 2002, No 106
β¨ LLM interpretation of page content
π°
Financial Performance Measures for Network Waitaki Limited
(continued from previous page)
π° Finance & RevenueFinancial Performance, Efficiency Measures, Network Waitaki Limited, Electricity, Load Factor, Loss Ratio, Capacity Utilisation