✨ Financial Performance Measures




Network Waitaki Limited (Lines)

Reliability and Performance Measures

Interruptions

Class 2003/07 (Target) 2003 (Target) 2002 2001 2000 1999
Number of interruptions
Planned Interruptions Class A 0 0 0 0 0 0
Class B 24 24 70 28 9 8
Unplanned Interruptions Class C 80 80 75 79 49 76
Class D 0 0 0 0 0 0
Class E-I 0 0 0 0 0 0
Total 104 104 145 107 58 84
Proportion Of Total Class C Interruptions not restored:
Within 3 Hours
Within 24 Hours

Faults

Voltage 2003/07 (Target) 2003 (Target) 2002 2001 2000 1999
Overall System
Faults per 100 circuit kilometres of prescribed voltage electric line
0.84 0.84 4.43 4.70 2.92 4.56
33kV 0.72 0.72 0.72 0.72 0.00
11kV 0.85 0.85 4.76 5.05 3.19

| Overhead |
| Faults per 100 circuit kilometres of prescribed voltage electric line |
| | 4.46 | 4.78 | 2.90 | 4.49 |
| | 33kV | 0.73 | 0.73 | 0.00 | 0.73 |
| | 11kV | 4.79 | 5.15 | 3.16 | 4.83 |

| Underground |
| Faults per 100 circuit kilometres of prescribed voltage electric line |
| | 3.14 | 0.00 | 5.06 | 10.16 |
| | 33kV | 0.00 | 0.00 | 0.00 | 0.00 |
| | 11kV | 3.17 | 0.00 | 5.13 | 10.31 |



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2002, No 106


Gazette.govt.nz PDF NZ Gazette 2002, No 106





✨ LLM interpretation of page content

πŸ’° Financial Performance Measures for Network Waitaki Limited (continued from previous page)

πŸ’° Finance & Revenue
Financial Performance, Efficiency Measures, Network Waitaki Limited, Electricity, Load Factor, Loss Ratio, Capacity Utilisation