✨ Financial Performance Measures




Network Waitaki Limited (Lines)

Financial Performance Measures - 31 March

2002 2001 2000 1999
Accounting return on funds 2.09% 3.79% 6.39% 2.93%
Accounting return on equity 0.93% 1.94% 4.14% 1.72%
Accounting return on investments 4.20% 0.28% 4.38% 1.77%

Efficiency Performance Measures - 31 March

2002 2001 2000 1999
Direct line costs per kilometre $717.43 $676.30 $640.25 $525.45
Direct expenditure $1,370,989 $1,285,824 $1,212,634 $990,589
System length (km) 1,910.96 1,901.27 1,893.85 1,885.22
2002 2001 2000 1999
Indirect line costs per consumer* $22.60 $21.45 $42.21 $41.18
Indirect expenditure $256,336 $243,921 $481,522 $468,786
Total consumers 11,341 11,372** 11,409** 11,385**

Energy Delivery Efficiency Performance Measures - 31 March

2002 2001 2000 1999
Load Factor (= a/b/c x 100) 70.41% 63.50% 70.28% 64.23%
a = kWh of electricity entering system 179,024,561 174,420,448* 177,930,085* 168,982,164*
b = Maximum Demand (kW) 29,026 31,356* 28,824* 30,024*
c = Total number of hours 8,760 8,760 8,760 8,760
2002 2001 2000 1999
Loss Ratio (= a/b x 100) 6.28% 7.89% 5.65% 6.12%
a = Total Electricity lost in the Network (kWh) 11,238,979 13,762,867* 10,060,459 10,341,540
b = Total Electricity entering the Network before losses (kWh) 179,024,561 174,420,448* 177,930,085* 168,982,164*
2002 2001 2000 1999
Capacity Utilisation (= a/b x 100) 23.20% 25.98% 24.52% 25.57%
a = Maximum Demand (kW) 29,026 31,356* 28,824* 30,024*
b = Transformer Capacity (KVA) 125,113 120,693 117,570 117,428
  • Demand and usage levels have been re-stated based on actual metered amounts.

** Comparative figures have been re-stated based on 'total consumers' rather than 'total connections' (which included de-energised connections).



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2002, No 106


Gazette.govt.nz PDF NZ Gazette 2002, No 106





✨ LLM interpretation of page content

πŸ’° Financial Performance Measures for Network Waitaki Limited (continued from previous page)

πŸ’° Finance & Revenue
Financial Performance, Efficiency Measures, Network Waitaki Limited, Electricity, Load Factor, Loss Ratio, Capacity Utilisation