✨ Electricity Reliability Performance




31 AUGUST

NEW ZEALAND GAZETTE

2857

Schedule 1 Part 5 Reliability Performance Measures to be Disclosed by Line Owners Other Than Transpower

7

Faults per 100 km (Underground)

8,9,10,11

SAIDI

Target 2002 to 2006

Actual 2001

Actual 2000

Actual 1999

Actual 1998

33 kV

2.42

1.34

2.96

11 kV

3.57

4.25

2.72

3.67

TOTAL

3.38

3.77

2.99

3.11

Class A Planned outages TransPower

3.90

Class B Planned outages WEL

4.00

4.55

4.35

5.05

4.51

Class C Unplanned outages WEL

81.80

126.56

106.83

132.27

143.25

Class D Unplanned outages TransPower

26.56

5.02

47.29

43.43

Class E Unplanned Interruption ECNZ

Class F Unplanned Interruption other generator

Class G Other interruption

TOTAL

157.67

116.21

184.61

191.19



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2001, No 110


Gazette.govt.nz PDF NZ Gazette 2001, No 110





✨ LLM interpretation of page content

🏭 Statement of Performance Measures for WEL Networks Limited (continued from previous page)

🏭 Trade, Customs & Industry
Energy Delivery, Performance Measures, Faults per 100 km, SAIDI, Planned outages, Unplanned outages, TransPower, WEL, ECNZ