✨ Reliability Performance Measures




NEW ZEALAND GAZETTE

No. 110


Schedule 1 Part 5 Reliability Performance Measures to be Disclosed by Line Owners Other Than Transpower

SAIFI TOTAL
Class A Class B Class C Class D Class E Class F Unplanned Interruption other generator
12, 13, 14, 15 Planned outages TransPower Planned outages WEL Unplanned outages TransPower Unplanned outages WEL Unplanned Interruption ECNZ
Actual 1998 0.06 - 0.12 2.12 0.14 - -
Actual 1999 0.05 - 0.84 1.81 0.59 - -
Actual 2000 0.06 - 2.31 0.08 - - -
Actual 2001 0.05 - 0.57 2.57 0.80 - -
Target 2002 0.05 1.55 - - - - -
Target 2002 to 2006 0.37 - 1.3 - - - -

CAIDI Other Interruption
Class A Class B Class C Class D Class E Class F Unplanned Interruption ECNZ generator
16, 17, 18, 19 Planned outages TransPower Planned outages WEL Unplanned outages TransPower Unplanned outages WEL Unplanned Interruption other
Actual 1998 - 79.58 29.58 67.73 301.34 - 82.56
Actual 1999 - 94.71 71.97 - 80.07 - 74.39
Actual 2000 - 78.15 46.25 63.31 - - 47.52
Actual 2001 - 82.74 49.22 31.32 - - 46.10
Target 2002 80.00 62.00 - - - - -
Target 2002 to 2006 78.60 59.60 - - - - -


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2001, No 110


Gazette.govt.nz PDF NZ Gazette 2001, No 110





✨ LLM interpretation of page content

🏭 Statement of Performance Measures for WEL Networks Limited (continued from previous page)

🏭 Trade, Customs & Industry
Energy Delivery, Performance Measures, Faults per 100 km, SAIDI, Planned outages, Unplanned outages, TransPower, WEL, ECNZ