✨ Reliability Performance Measures




Schedule 1 Part 5 Reliability Performance Measures to be Disclosed by Line Owners Other Than Transpower

1,2,3

Total Interruptions Class A Planned outages TransPower Class B Planned outages WEL Class C Unplanned outages WEL Class D Unplanned outages Transpower Class E Unplanned Interruption ECNZ Class F Unplanned interruption other generator Other Interruption Total
Actual 1998 50 46 258 261 1 - - 312
Actual 1999 - - - - - - - 305
Actual 2000 - 50 195 2 - - - 247
Actual 2001 - 118 207 2 - - - 327
Target 2002 30 165 - - - - - -
Target 2002 to 2006 28 148 - - - - - -

4

Class C interruptions not restored within 3 hours Class C interruptions not restored within 24 hours
15.0% 0.0%
- 0.21
0.14 -
- -
- -
- -

5

Faults per 100 km (Total)
33 kV
10.08
2.27
6.65
2.89
1.09
0.78

6

Faults per 100 km (Overhead)
33 kV
10.08
10.8
8.67
8.60
3.01
-


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2001, No 110


Gazette.govt.nz PDF NZ Gazette 2001, No 110





✨ LLM interpretation of page content

🏭 Statement of Performance Measures for WEL Networks Limited (continued from previous page)

🏭 Trade, Customs & Industry
Energy Delivery, Performance Measures, Load Factor, Loss Ratio, Circuit km, Transformer Capacity, Maximum Demand, Electricity Supply