✨ Powerco Fault Statistics




20 SEPTEMBER

NEW ZEALAND GAZETTE

20.5a Total Number Of Faults Per 100km

Of Prescribed Voltage Line

Nominal Voltage 1999 Powerco Number of Faults/100km 1998 Powerco Number of Faults/100km 1997 Powerco Number of Faults/100km 1996 Powerco Number of Faults/100km 1995 Taranaki Energy Number of Faults/100km 1995 Powerco Number of Faults/100km
110kV 0.00
33kV 3.48 9.70 21.34 13.24
22kV
11kV 9.88 9.73 9.49 12.93
6.6kV 0.59
Total 8.39 9.73 9.49 12.93 13.24

20.5b Total Number Of Faults Per 100km

Of Prescribed Voltage Line
(Targeted for the Following Financial Year)

Nominal Voltage 1999 Powerco Number of Faults/100km
110kV 0.00
33kV 3.88
22kV 9.70
11kV 9.99
6.6kV 0.59
3.3kV 0.00
Total 8.58

20.5c Total Number Of Faults Per 100km

Of Prescribed Voltage Line
(Targeted for the Following Financial Year and Subsequent 4 Financial Years)

Nominal Voltage 1999 Powerco Number of Faults/100km
110kV 0.00
33kV 3.90
22kV 9.70
11kV 10.00
6.6kV 0.60
3.3kV 0.00
Total 8.60

20.6 Total Number Of Faults Per 100km Of

Prescribed Voltage Underground Line

Nominal Voltage 1999 Powerco Number of Faults/100km 1998 Powerco Number of Faults/100km 1997 Powerco Number of Faults/100km 1996 Powerco Number of Faults/100km 1995 Taranaki Energy Number of Faults/100km 1995 Powerco Number of Faults/100km
33kV 0.00 0.00 0.00 0.00 0.00 0.00
22kV 0.00 0.00 0.00 0.00 0.00 0.00
11kV 2.78 2.95 1.22 6.21 2.56 0.00
6.6kV 0.00 0.00 0.00 0.00 5.92 0.00
Total 2.47 2.56 1.05 5.32 2.84 0.00


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1999, No 129


NZLII PDF NZ Gazette 1999, No 129





✨ LLM interpretation of page content

🏭 Disclosure of Performance Measures for Powerco Limited (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Information Disclosure, Performance Measures, Faults, Voltage Lines, Powerco Limited