β¨ Electricity Performance Measures
NEW ZEALAND GAZETTE
No. 129
| 1999 Powerco | 1998 Powerco | 1997 Powerco | 1996 Powerco | 1995 Taranaki Energy | 1995 Powerco | |
|---|---|---|---|---|---|---|
| (d) Transformer Capacity (kVA) | 831,536 | 639,581 | 568,319 | 629,659 | 304,062 | 265,080 |
| (e) Maximum Demand (kW) | 234,050 | 196,000 | 177,311 | 182,520 | 97,688 | 72,162 |
| (f) Total Electricity Supplied From System (kWh) | 1,377,340,529 | 1,019,475,673 | 849,103,244 | 864,631,066 | 466,951,236 | 347,049,291 |
| (g) Total Electricity Conveyed Through System On Behalf Of Other Electricity Retailers (kWh) | 77,456,468 | 2,492,834 | 17,821,943 | 39,360,065 | 349,131 | Nil |
| (h) Total Customers | 104,370 | 84,373 | 71,730 | 72,407 | 39,467 | 33,161 |
20 DISCLOSURE OF PERFORMANCE MEASURES PURSUANT TO REGULATION 22 AND PART VI OF THE FIRST SCHEDULE OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1999
20.1 Total Number Of Interruptions
| Interruption Class | 1999 Powerco | Number of Interruptions | 1998 Powerco | Number of Interruptions | 1997 Powerco | Number of Interruptions | 1996 Powerco | Number of Interruptions | 1995 Taranaki Energy | Number of Interruptions | 1995 Powerco | Number of Interruptions |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Class A - Transpower Planned | 4.00 | 3.00 | 3.00 | 4.00 | 0.00 | 5.00 | ||||||
| Class B - Distributor Planned | 400.00 | 374.00 | 406.00 | 397.00 | 312.00 | 100.00 | ||||||
| Class C - Distributor Unplanned | 691.00 | 627.00 | 499.00 | 670.00 | 533.00 | 360.00 | ||||||
| Class D - Transpower Unplanned | 4.00 | 7.00 | 5.00 | 17.00 | 2.00 | 12.00 | ||||||
| Class E - ECNZ Unplanned | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| Class F - Other Generator Unplanned | 0.00 | 0.00 | 2.00 | 0.00 | 0.00 | 0.00 | ||||||
| Class G - Other Line Owner (Not in A to F) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| Class H - Other Line Owner (Not in A to G) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| Class I - Other Owner | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| Total | 1099.00 | 1011.00 | 915.00 | 1088.00 | 847.00 | 477.00 |
20.2 Interruption Targets for the Following Financial Year
| 1999 Powerco | |
|---|---|
| Class B - Principal Line Owner Planned | 428 |
| Class C - Principal Line Owner Unplanned | 859 |
20.3 Average Interruption Targets for the Following Financial Year and Subsequent 4 Financial Years
| 1999 Powerco | |
|---|---|
| Class B - Principal Line Owner Planned | 428 |
| Class C - Principal Line Owner Unplanned | 859 |
20.4 Proportion of the Total Number of Faults Not Restored Within:
| Period | 1999 Powerco | |
|---|---|---|
| Class B - Principal Line Owner Planned | 3 Hours | 8.2 |
| Class C - Principal Line Owner Unplanned | 24 Hours | 0.9 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1999, No 129
NZLII —
NZ Gazette 1999, No 129
β¨ LLM interpretation of page content
π
Disclosure of Performance Measures for Powerco Limited
(continued from previous page)
π Trade, Customs & IndustryElectricity, Information Disclosure, Performance Measures, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Overhead Line Length, Underground Line Length, Powerco Limited