✨ Electricity Performance Measures




NEW ZEALAND GAZETTE

No. 129

1999 Powerco 1998 Powerco 1997 Powerco 1996 Powerco 1995 Taranaki Energy 1995 Powerco
(d) Transformer Capacity (kVA) 831,536 639,581 568,319 629,659 304,062 265,080
(e) Maximum Demand (kW) 234,050 196,000 177,311 182,520 97,688 72,162
(f) Total Electricity Supplied From System (kWh) 1,377,340,529 1,019,475,673 849,103,244 864,631,066 466,951,236 347,049,291
(g) Total Electricity Conveyed Through System On Behalf Of Other Electricity Retailers (kWh) 77,456,468 2,492,834 17,821,943 39,360,065 349,131 Nil
(h) Total Customers 104,370 84,373 71,730 72,407 39,467 33,161

20 DISCLOSURE OF PERFORMANCE MEASURES PURSUANT TO REGULATION 22 AND PART VI OF THE FIRST SCHEDULE OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1999

20.1 Total Number Of Interruptions

Interruption Class 1999 Powerco Number of Interruptions 1998 Powerco Number of Interruptions 1997 Powerco Number of Interruptions 1996 Powerco Number of Interruptions 1995 Taranaki Energy Number of Interruptions 1995 Powerco Number of Interruptions
Class A - Transpower Planned 4.00 3.00 3.00 4.00 0.00 5.00
Class B - Distributor Planned 400.00 374.00 406.00 397.00 312.00 100.00
Class C - Distributor Unplanned 691.00 627.00 499.00 670.00 533.00 360.00
Class D - Transpower Unplanned 4.00 7.00 5.00 17.00 2.00 12.00
Class E - ECNZ Unplanned 0.00 0.00 0.00 0.00 0.00 0.00
Class F - Other Generator Unplanned 0.00 0.00 2.00 0.00 0.00 0.00
Class G - Other Line Owner (Not in A to F) 0.00 0.00 0.00 0.00 0.00 0.00
Class H - Other Line Owner (Not in A to G) 0.00 0.00 0.00 0.00 0.00 0.00
Class I - Other Owner 0.00 0.00 0.00 0.00 0.00 0.00
Total 1099.00 1011.00 915.00 1088.00 847.00 477.00

20.2 Interruption Targets for the Following Financial Year

1999 Powerco
Class B - Principal Line Owner Planned 428
Class C - Principal Line Owner Unplanned 859

20.3 Average Interruption Targets for the Following Financial Year and Subsequent 4 Financial Years

1999 Powerco
Class B - Principal Line Owner Planned 428
Class C - Principal Line Owner Unplanned 859

20.4 Proportion of the Total Number of Faults Not Restored Within:

Period 1999 Powerco
Class B - Principal Line Owner Planned 3 Hours 8.2
Class C - Principal Line Owner Unplanned 24 Hours 0.9


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1999, No 129


NZLII PDF NZ Gazette 1999, No 129





✨ LLM interpretation of page content

🏭 Disclosure of Performance Measures for Powerco Limited (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Information Disclosure, Performance Measures, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Overhead Line Length, Underground Line Length, Powerco Limited