β¨ Electricity Information Disclosure
20 SEPTEMBER NEW ZEALAND GAZETTE 3121
18 DISCLOSURE OF OPTIMAL DEPRIVAL VALUE (ODV) PURSUANT TO REGULATION 20
OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1999
ODV as per latest valuation $247,922.496
19 DISCLOSURE OF PERFORMANCE MEASURES PURSUANT TO REGULATION 21
AND PART IV OF THE FIRST SCHEDULE OF THE ELECTRICITY (INFORMATION
DISCLOSURE) REGULATIONS 1999
19.1
(a) Load Factor 1999 1998 1997 1996 1995 1995
Powerco Powerco Powerco Powerco Taranaki Energy Powerco
64.72% 67.66% 58.03% 60.29% 58.10% 58.13%
(b) Loss Ratio 6.80% 6.15% 5.99% 6.48% 6.20% 6.15%
(c) Capacity Utilisation 29.80% 30.49% 31.19% 28.99% 32.10% 28.22%
19.2 (a) System Length
| Nominal Voltage | 1999 Powerco Total System Length (km) | 1998 Powerco Total System Length (km) | 1997 Powerco Total System Length (km) | 1996 Powerco Total System Length (km) | 1995 Taranaki Energy Total System Length (km) | 1995 Powerco Total System Length (km) |
|-----------------|-----------------------------------|-----------------------------------|-----------------------------------|-----------------------------------|------------------------------------------|-----------------------------------|
| 110kV | 23 | | | | | |
| 33kV | 759.71 | 568.02 | 417.09 | 411.84 | 273.00 | 179.00 |
| 22kV | 113.43 | 113.34 | 113.26 | 114.10 | 0.00 | 61.00 |
| 11kV | 6490.71 | 4905.68 | 3870.98 | 3776.73 | 1339.00 | 2426.00 |
| 6.6kV | 846.51 | 837.27 | 857.03 | 986.44 | 895.00 | 97.00 |
| 230/400V | 2903.27 | 2231.14 | 2075.76 | 2072.18 | 1348.00 | 724.00 |
| Total | 11136.63 | 8655.45 | 7334.12 | 7361.29 | 3855.00 | 3487.00 |
(b) Overhead Line Length
| Nominal Voltage | 1999 Powerco O/H Line Length (km) | 1998 Powerco O/H Line Length (km) | 1997 Powerco O/H Line Length (km) | 1996 Powerco O/H Line Length (km) | 1995 Taranaki Energy O/H Line Length (km) | 1995 Powerco O/H Line Length (km) |
|-----------------|--------------------------------|--------------------------------|--------------------------------|--------------------------------|----------------------------------------|--------------------------------|
| 110kV | 23 | | | | | |
| 33kV | 744.28 | 554.28 | 407.41 | 402.29 | 266.00 | 177.00 |
| 22kV | 113.17 | 113.15 | 113.07 | 113.91 | 0.00 | 61.00 |
| 11kV | 6274.93 | 4736.15 | 3707.30 | 3615.57 | 1222.00 | 2386.00 |
| 6.6kV | 834.67 | 825.43 | 839.67 | 969.34 | 878.00 | 97.00 |
| 230/400V | 2413.85 | 1823.60 | 1707.08 | 1709.21 | 1106.00 | 605.00 |
| Total | 10403.90 | 8052.61 | 6774.53 | 6810.32 | 3472.00 | 3326.00 |
(c) Underground Line Length
| Nominal Voltage | 1999 Powerco U/G Line Length (km) | 1998 Powerco U/G Line Length (km) | 1997 Powerco U/G Line Length (km) | 1996 Powerco U/G Line Length (km) | 1995 Taranaki Energy U/G Line Length (km) | 1995 Powerco U/G Line Length (km) |
|-----------------|--------------------------------|--------------------------------|--------------------------------|--------------------------------|----------------------------------------|--------------------------------|
| 110 kV | 0 | | | | | |
| 33kV | 15.43 | 13.74 | 9.68 | 9.55 | 7.00 | 2.00 |
| 22kV | 0.23 | 0.19 | 0.19 | 0.19 | 0.00 | 0.00 |
| 11kV | 215.78 | 169.53 | 163.68 | 161.16 | 117.00 | 40.00 |
| 6.6kV | 11.84 | 11.84 | 17.36 | 17.10 | 17.00 | 0.00 |
| 230/400V | 489.42 | 407.54 | 368.68 | 362.97 | 242.00 | 119.00 |
| Total | 732.69 | 602.84 | 559.59 | 550.97 | 383.00 | 161.00 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1999, No 129
NZLII —
NZ Gazette 1999, No 129
β¨ LLM interpretation of page content
π
Notes to the Financial Statements for Powerco Limited
(continued from previous page)
π Trade, Customs & IndustryFinancial Instruments, Credit Risk, Interest Rate Risk, Related Party Transactions, Allocation Methodology, Powerco Limited
π Disclosure of Optimal Deprival Value (ODV) for Powerco Limited
π Trade, Customs & IndustryElectricity, Information Disclosure, Optimal Deprival Value, Powerco Limited
π Disclosure of Performance Measures for Powerco Limited
π Trade, Customs & IndustryElectricity, Information Disclosure, Performance Measures, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Overhead Line Length, Underground Line Length, Powerco Limited