β¨ Electricity Reliability Performance Measures
NEW ZEALAND GAZETTE
No. 128
B. RELIABILITY PERFORMANCE MEASURES (1999 REGULATIONS)
B1. Total number of interruptions, together with a breakdown of that total according to interruption class.
| Interruption Class | Number of Interruptions |
|---|---|
| 1999 | |
| MainPower | |
| Planned Shut-Down (Class B) | 111 |
| Unplanned Interruption (Class C) | 143 |
| Trans Power | |
| Planned Shut-Down (Class A) | 1 |
| Unplanned Interruption (Class D) | - |
| Generation ECNZ | |
| Unplanned Interruption (Class E) | - |
| Generation Other | |
| Unplanned Interruption (Class F) | - |
| Other | |
| Other Interruptions (Class G) | - |
| Total Interruptions | 255 |
B2. The total number of faults per 100 circuit kilometres of prescribed voltage electric line.
4.27 faults | 16.62 Faults | 16.54 Faults | 13.29 Faults
B3. The total number of faults per 100 circuit kilometres of underground prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
| Nominal Voltage | Faults per 100 km |
|---|---|
| 1999 | |
| 33 kV | - |
| 11 kV | 1.17 |
| TOTAL | 1.14 |
B4. The total number of faults per 100 circuit kilometres of overhead prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
| Nominal Voltage | Faults per 100 km |
|---|---|
| 1999 | |
| 33 kV | 3.35 |
| 11 kV | 4.40 |
| TOTAL | 4.31 |
B5. The SAIDI for the total of interruptions:
204.71 | 225.05 | 281.85 | 415.58
B6. The SAIDI for the total number of interruptions within each interruption class:
| Network or Generation Owner | Classification | Minutes per Connected Customer |
|---|---|---|
| 1999 | ||
| MainPower | Planned Shut-Down (Class B) | 86.98 |
| Unplanned Interruption (Class C) | 103.27 | |
| Trans Power | Planned Shut-Down (Class A) | 14.46 |
| Unplanned Interruption (Class D) | - | |
| Generation ECNZ | Unplanned Interruption (Class E) | - |
| Generation Other | Unplanned Interruption (Class F) | - |
| Other | Other Interruptions (Class G) | - |
| Unplanned Interruption (Class G) | - |
B7. The SAIFI for the total number of interruptions:
1.83 | 3.68 | 4.38 | 2.90
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1999, No 128
NZLII —
NZ Gazette 1999, No 128
β¨ LLM interpretation of page content
π
Electricity Network Interruption Performance by Owner
(continued from previous page)
π Trade, Customs & IndustryElectricity, Interruptions, SAIDI, SAIFI, CAIDI, MainPower, Trans Power, ECNZ