β¨ Electricity Network Performance Statistics
20 SEPTEMBER NEW ZEALAND GAZETTE 3095
| Nominal Voltage | Lines | Cable | Total |
|---|---|---|---|
| Faults per 100 km | Faults per 100 km | Faults per 100 km | |
| 33 kV | 3.35 | 0.00 | 3.32 |
| 11 kV | 4.40 | 1.17 | 4.31 |
| TOTALS | 4.31 | 1.14 | 4.27 |
Faults/100km Faults/100km 33kV Faults/100km 11kV
Target 31/03/00 5 4 5
31/03/2000 Avg forecast 5.54 5.39 5.55
31/03/2001 Avg forecast 5.04 4.54 5.04
31/03/2002 Avg forecast 4.54 3.69 4.53
31/03/2003 Avg forecast 4.04 2.84 4.02
31/03/2004 Avg forecast 3.54 1.99 3.51
A8. The SAIDI, SAIFI, CAIDI for the total number of interruptions.
SAIDI targets for the following financial year for-
(a) Planned interruptions by the line owner (Class B); and
(b) Unplanned interruptions originating within the works of the line owner (Class C).
Average SAIDI targets for the following financial year and the subsequent 4 financial years for each of-
(a) Planned interruptions by the line owner (Class B); and
(b) Unplanned interruptions originating within the works of the line owner (Class C).
The SAIDI for the total number of interruptions within each interruption class.
| NETWORK OR GENERATION OWNER | Disc Reg Class | CLASSIFICATION OF INTERRUPTIONS | SAIDI | SAIFI | CAIDI |
|---|---|---|---|---|---|
| Numerator (Cust-min) | Numerator (Cust-int) | Result (min/Cust int) | |||
| Result (min/Conn Cust) | Result (Int/Conn Cust) | ||||
| MainPower | B | Planned Shut-downs | 1990559 | 8612 | 231.14 |
| C + G | Unplanned Interruptions | 2363510 | 31928 | 74.03 | |
| Subtotal | 4354069 | 40540 | 107.40 | ||
| Trans Power | A | Planned Shut-downs | 330948 | 1417 | 0.06 |
| D | Unplanned Interruptions | 0 | 0 | 0.00 | |
| Subtotal | 330948 | 1417 | 233.56 | ||
| Other ECNZ | G | Other Interruptions | 0 | 0 | 0.00 |
| E | Unplanned Interruptions | 0 | 0 | 0.00 | |
| Subtotal | 0 | 0 | 0.00 | ||
| TOTAL | 4685017 | 41957 | 111.66 | ||
| Common Denominator = No of Cust. | 22886 |
Class B
Target 31/03/00 SAIDI SAIFI CAIDI
31/03/2000 Avg forecast 43 0.198 217
31/03/2001 Avg forecast 45 0.210 212
31/03/2002 Avg forecast 43 0.211 202
31/03/2003 Avg forecast 41 0.211 192
31/03/2004 Avg forecast 39 0.212 182
Class C
Target 31/03/00 SAIDI SAIFI CAIDI
31/03/2000 Avg forecast 133 2.07 61
31/03/2001 Avg forecast 118 2.02 58
31/03/2002 Avg forecast 103 1.93 53
31/03/2003 Avg forecast 88 1.82 48
31/03/2004 Avg forecast 73 1.68 43
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1999, No 128
NZLII —
NZ Gazette 1999, No 128
β¨ LLM interpretation of page content
π
Certification of Performance Measures by Auditors
(continued from previous page)
π Trade, Customs & Industry2 September 1999
Audit, Performance Measures, Electricity, Information Disclosure, Mainpower New Zealand Ltd
π Electricity Network Fault Rates by Voltage
π Trade, Customs & IndustryElectricity, Fault Rates, Voltage, 33kV, 11kV, Lines, Cables
π Electricity Network Interruption Performance Metrics
π Trade, Customs & IndustryElectricity, Interruptions, SAIDI, SAIFI, CAIDI, Planned, Unplanned, Performance Targets
π Electricity Network Interruption Performance by Owner
π Trade, Customs & IndustryElectricity, Interruptions, SAIDI, SAIFI, CAIDI, MainPower, Trans Power, ECNZ