β¨ Electricity Network Interruption Performance
20 SEPTEMBER NEW ZEALAND GAZETTE 3097
B8. The SAIFI for the total number of interruptions within each interruption class:
| Network or Generation Owner | Classification | Interruption per Connected Customer (%) |
|---|---|---|
| 1999 | ||
| MainPower | Planned Shut-Down (Class B) | 0.38 |
| MainPower | Unplanned Interruption (Class C) | 1.40 |
| Trans Power | Planned Shut-Down (Class A) | 0.06 |
| Trans Power | Unplanned Interruption (Class D) | - |
| Generation ECNZ | Unplanned Interruption (Class E) | - |
| Generation Other | Unplanned Interruption (Class F) | - |
| Other | Other Interruptions (Class G) | - |
| Other | Unplanned Interruption (Class G) | - |
B9. The CAIDI for the total of all interruptions:
| 1999 | 1998 | 1997 | 1996 |
|---|---|---|---|
| 111.66 | 61.08 | 64.39 | 143.07 |
B10. The CAIDI for the total number of interruptions within each interruption class:
| Network or Generation Owner | Classification | Minutes per Customer Interruption |
|---|---|---|
| 1999 | ||
| MainPower | Planned Shut-Down (Class B) | 231.14 |
| MainPower | Unplanned Interruption (Class C) | 74.03 |
| Trans Power | Planned Shut-Down (Class A) | 233.56 |
| Trans Power | Unplanned Interruption (Class D) | - |
| Generation ECNZ | Unplanned Interruption (Class E) | - |
| Generation Other | Unplanned Interruption (Class F) | - |
| Other | Other Interruptions (Class G) | - |
| Other | Unplanned Interruption (Class G) | - |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1999, No 128
NZLII —
NZ Gazette 1999, No 128
β¨ LLM interpretation of page content
π
Electricity Network Interruption Performance by Owner
(continued from previous page)
π Trade, Customs & IndustryElectricity, Interruptions, SAIFI, CAIDI, MainPower, Trans Power, ECNZ