β¨ Electricity Disclosure Performance Measures
3094 NEW ZEALAND GAZETTE No. 128
MAINPOWER NEW ZEALAND LTD
A. DISCLOSURE RELIABILITY PERFORMANCE MEASURES TO BE DISCLOSED BY LINE OWNERS (OTHER THAN TRANS POWER) PURSUANT TO REGULATION 22 AND PART V OF THE FIRST SCHEDULE OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1999
For The Year Ended 31 March 1999
A1. Total number of interruptions, together with a breakdown of that total according to interruption class.
| NETWORK OR GENERATION OWNER | Disc Reg Class | CLASSIFICATION OF INTERRUPTIONS | |
|---|---|---|---|
| MainPower | B | Planned Shut-downs | 111 |
| C + G | Unplanned Interruptions | 143 | |
| Subtotal | |||
| Trans Power | A | Planned Shut-downs | 1 |
| D | Unplanned Interruptions | ||
| Subtotal | |||
| Other ECNZ | G | Other Interruptions | |
| E | Unplanned Interruptions | ||
| Subtotal | |||
| TOTAL | 255 |
A2. Interruption targets for the following financial year for-
(a) Planned interruptions by the line owner (Class B); and
(b) Unplanned interruptions originating within the works of the line owner (Class C).
A3. Average interruption targets for the following financial year and the subsequent 4 financial years for each of-
(a) Planned interruptions by the line owner (Class B); and
(b) Unplanned interruptions originating within the works of the line owner (Class C).
| Target 31/03/00 | Class B Interruptions | Class C Interruptions |
|---|---|---|
| 31/03/2000 Avg forecast | 67 | 189 |
| 31/03/2001 Avg forecast | 64 | 178 |
| 31/03/2002 Avg forecast | 61 | 167 |
| 31/03/2003 Avg forecast | 58 | 156 |
| 31/03/2004 Avg forecast | 55 | 145 |
A4. The proportion {expressed as a percentage} of the total number of Class C interruptions not restored within-
(a) 3 hours and;
(b) 24 hours.
| Not restored within 3 hours- % of Class C | Not restored within 24 hours- % of Class C |
|---|---|
| 13% | 0% |
A5. With respect to faults per 100 circuit kilometers of prescribed voltage electric line, the following information:
(a) The total number of faults; and
(b) The total number of faults targeted for the following financial year; and
(c) The average total number of faults for that financial year and the subsequent 4 financial years; and
(d) A breakdown of the fault information in accordance with paragraphs (a) to (c) by different nominal line voltages.
A6. The total number of faults per 100 circuit kilometres of underground prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
A7. The total number of faults per 100 circuit kilometres of overhead prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1999, No 128
NZLII —
NZ Gazette 1999, No 128
β¨ LLM interpretation of page content
π
Certification of Performance Measures by Auditors
(continued from previous page)
π Trade, Customs & Industry2 September 1999
Audit, Performance Measures, Electricity, Information Disclosure, Mainpower New Zealand Ltd