β¨ Electricity Performance Measures
20 SEPTEMBER NEW ZEALAND GAZETTE 3093
(d) Transformer capacity, (kilovolt amperes): 214829kVA 208420kVA 202362kVA 202585 kVA
(e) Maximum demand (Megawatts): 58.110MW 64.278MW 64.227MW 61.906 MW
(f) Total electricity supplied from the system,
(Kilowatt hours): 321,775,002 357,657,305 337,180,625 354,147,550
(g) Total electricity conveyed through the
system, on behalf of energy retailers
(Kilowatt hours):
MainPower (to 31 October 1998) 190,789,179
Other:
Retailer A 238,710
Retailer B 240,027
Retailer C 38,519,756
Retailer D 110,040,940 149,039,433 243,500 93,000
Total 339,828,612
(h) Total customers 22,859 24,786 23,486 23,701
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1999, No 128
NZLII —
NZ Gazette 1999, No 128
β¨ LLM interpretation of page content
π
Certification of Performance Measures by Auditors
(continued from previous page)
π Trade, Customs & Industry2 September 1999
Audit, Performance Measures, Electricity, Information Disclosure, Mainpower New Zealand Ltd