✨ Electricity Performance Measures




NEW ZEALAND GAZETTE

No. 151

(c) Underground Line Length

Nominal Voltage 1998 Powerco U/G Line Length (km) 1997 Powerco U/G Line Length (km) 1996 Powerco U/G Line Length (km) 1995 Taranaki Energy U/G Line Length (km) 1995 Powerco U/G Line Length (km)
33kV 13.74 9.68 9.55 7.00 2.00
22kV 0.19 0.19 0.19 0.00 0.00
11kV 169.53 163.68 161.16 117.00 40.00
6.6kV 11.84 17.36 17.10 17.00 0.00
230/400V 407.54 368.68 362.97 242.00 119.00
Total 602.84 559.59 550.97 383.00 161.00

(d) Transformer Capacity (kVA)

1998 Powerco 1997 Powerco 1996 Powerco 1995 Taranaki Energy 1995 Powerco
Transformer 639,581 568,319 629,659 304,062 265,080

(e) Maximum Demand (kW)

1998 Powerco 1997 Powerco 1996 Powerco 1995 Taranaki Energy 1995 Powerco
Maximum Demand 196,000 177,311 182,520 97,688 72,162

(f) Total Electricity Supplied From System (kWh)

1998 Powerco 1997 Powerco 1996 Powerco 1995 Taranaki Energy 1995 Powerco
Total Electricity 1,019,475,673 849,103,244 864,631,066 466,951,236 347,049,291

(g) Total Electricity Conveyed Through System On Behalf Of Other Electricity Retailers (kWh)

1998 Powerco 1997 Powerco 1996 Powerco 1995 Taranaki Energy 1995 Powerco
Total Electricity 2,492,834 17,821,943 39,360,065 349,131 Nil

(h) Total Customers

1998 Powerco 1997 Powerco 1996 Powerco 1995 Taranaki Energy 1995 Powerco
Total Customers 84,373 71,730 72,407 39,467 33,161

19 DISCLOSURE OF PERFORMANCE MEASURES PURSUANT TO REGULATION 16 AND PART IV OF THE FIRST SCHEDULE OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

19.1 Total Number Of Interruptions

Interruption Class 1998 Powerco Number of Interruptions 1997 Powerco Number of Interruptions 1996 Powerco Number of Interruptions 1995 Taranaki Energy Number of Interruptions 1995 Powerco Number of Interruptions
Class A - Transpower Planned 3.00 3.00 4.00 0.00 5.00
Class B - Distributor Planned 374.00 406.00 397.00 312.00 100.00
Class C - Distributor Unplanned 627.00 499.00 670.00 533.00 360.00
Class D - Transpower Unplanned 7.00 5.00 17.00 2.00 12.00
Class E - ECNZ Unplanned 0.00 0.00 0.00 0.00 0.00
Class F - Other Generator Unplanned 0.00 2.00 0.00 0.00 0.00
Class G - Other (Not in A to F) 0.00 0.00 0.00 0.00 0.00
Total 1011.00 915.00 1088.00 847.00 477.00


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1998, No 151


NZLII PDF NZ Gazette 1998, No 151





✨ LLM interpretation of page content

🏭 Disclosure of Performance Measures for Powerco Limited (continued from previous page)

🏭 Trade, Customs & Industry