✨ Performance Measures for Powerco Limited




21 SEPTEMBER NEW ZEALAND GAZETTE 3663

19.2
Total Number Of Faults Per 100km Of Prescribed Voltage Line

1998 Powerco 1997 Powerco 1996 Powerco 1995 Taranaki Energy 1995 Powerco
9.73 9.49 12.93 21.34 13.24

19.3
Total Number Of Faults Per 100km Of Prescribed Voltage Underground Line

Nominal Voltage 1998 Powerco Number of Faults/100km 1997 Powerco Number of Faults/100km 1996 Powerco Number of Faults/100km 1995 Taranaki Energy Number of Faults/100km 1995 Powerco Number of Faults/100km
33kV 0.00 0.00 0.00 0.00 0.00
22kV 0.00 0.00 0.00 0.00 0.00
11kV 2.95 1.22 6.21 2.56 0.00
6.6kV 0.00 0.00 0.00 5.92 0.00
Total 2.56 1.05 5.32 2.84 0.00

19.4
Total Number Of Faults Per 100km Of Prescribed Voltage Overhead Line

Nominal Voltage 1998 Powerco Number of Faults/100km 1997 Powerco Number of Faults/100km 1996 Powerco Number of Faults/100km 1995 Taranaki Energy Number of Faults/100km 1995 Powerco Number of Faults/100km
33kV 5.77 5.65 5.47 12.77 10.82
22kV 7.07 8.84 15.80 0.00 79.30
11kV 11.99 10.84 15.13 28.64 12.11
6.6kV 1.70 7.38 8.98 16.74 4.13
Total 9.95 9.81 13.21 22.44 13.24


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1998, No 151


NZLII PDF NZ Gazette 1998, No 151





✨ LLM interpretation of page content

🏭 Disclosure of Performance Measures for Powerco Limited (continued from previous page)

🏭 Trade, Customs & Industry
Performance Measures, Electricity, Powerco Limited, Faults, Prescribed Voltage Line, Underground Line, Overhead Line