β¨ Performance Measures for Powerco Limited
21 SEPTEMBER NEW ZEALAND GAZETTE 3663
19.2
Total Number Of Faults Per 100km Of Prescribed Voltage Line
| 1998 Powerco | 1997 Powerco | 1996 Powerco | 1995 Taranaki Energy | 1995 Powerco | |
|---|---|---|---|---|---|
| 9.73 | 9.49 | 12.93 | 21.34 | 13.24 |
19.3
Total Number Of Faults Per 100km Of Prescribed Voltage Underground Line
| Nominal Voltage | 1998 Powerco Number of Faults/100km | 1997 Powerco Number of Faults/100km | 1996 Powerco Number of Faults/100km | 1995 Taranaki Energy Number of Faults/100km | 1995 Powerco Number of Faults/100km |
|---|---|---|---|---|---|
| 33kV | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| 22kV | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| 11kV | 2.95 | 1.22 | 6.21 | 2.56 | 0.00 |
| 6.6kV | 0.00 | 0.00 | 0.00 | 5.92 | 0.00 |
| Total | 2.56 | 1.05 | 5.32 | 2.84 | 0.00 |
19.4
Total Number Of Faults Per 100km Of Prescribed Voltage Overhead Line
| Nominal Voltage | 1998 Powerco Number of Faults/100km | 1997 Powerco Number of Faults/100km | 1996 Powerco Number of Faults/100km | 1995 Taranaki Energy Number of Faults/100km | 1995 Powerco Number of Faults/100km |
|---|---|---|---|---|---|
| 33kV | 5.77 | 5.65 | 5.47 | 12.77 | 10.82 |
| 22kV | 7.07 | 8.84 | 15.80 | 0.00 | 79.30 |
| 11kV | 11.99 | 10.84 | 15.13 | 28.64 | 12.11 |
| 6.6kV | 1.70 | 7.38 | 8.98 | 16.74 | 4.13 |
| Total | 9.95 | 9.81 | 13.21 | 22.44 | 13.24 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1998, No 151
NZLII —
NZ Gazette 1998, No 151
β¨ LLM interpretation of page content
π
Disclosure of Performance Measures for Powerco Limited
(continued from previous page)
π Trade, Customs & IndustryPerformance Measures, Electricity, Powerco Limited, Faults, Prescribed Voltage Line, Underground Line, Overhead Line