β¨ Electricity Performance and ODV Disclosure
21 SEPTEMBER NEW ZEALAND GAZETTE 3661
17 DISCLOSURE OF OPTIMAL DEPRIVAL VALUE (ODV) PURSUANT TO REGULATION 14 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994
ODV as at 31 March 1998 $197,612,686
18 DISCLOSURE OF PERFORMANCE MEASURES PURSUANT TO REGULATION 15 AND PART III OF THE FIRST SCHEDULE OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994
18.1
| 1998 Powerco | 1997 Powerco | 1996 Powerco | 1995 Taranaki Energy | 1995 Powerco | |
|---|---|---|---|---|---|
| (a) Load Factor | 67.66% | 58.03% | 60.29% | 58.10% | 58.13% |
| (b) Loss Ratio | 6.15% | 5.99% | 6.48% | 6.20% | 6.15% |
| (c) Capacity Utilisation | 30.49% | 31.19% | 28.99% | 32.10% | 28.22% |
18.2
(a) System Length
| Nominal Voltage | 1998 Powerco Total System Length (km) | 1997 Powerco Total System Length (km) | 1996 Powerco Total System Length (km) | 1995 Taranaki Energy Total System Length (km) | 1995 Powerco Total System Length (km) |
|---|---|---|---|---|---|
| 33kV | 568.02 | 417.09 | 411.84 | 273.00 | 179.00 |
| 22kV | 113.34 | 113.26 | 114.10 | 0.00 | 61.00 |
| 11kV | 4905.68 | 3870.98 | 3776.73 | 1339.00 | 2426.00 |
| 6.6kV | 837.27 | 857.03 | 986.44 | 895.00 | 97.00 |
| 230/400V | 2231.14 | 2075.76 | 2072.18 | 1348.00 | 724.00 |
| Total | 8655.45 | 7334.12 | 7361.29 | 3855.00 | 3487.00 |
(b) Overhead Line Length
| Nominal Voltage | 1998 Powerco O/H Line Length (km) | 1997 Powerco O/H Line Length (km) | 1996 Powerco O/H Line Length (km) | 1995 Taranaki Energy O/H Line Length (km) | 1995 Powerco O/H Line Length (km) |
|---|---|---|---|---|---|
| 33kV | 554.28 | 407.41 | 402.29 | 266.00 | 177.00 |
| 22kV | 113.15 | 113.07 | 113.91 | 0.00 | 61.00 |
| 11kV | 4736.15 | 3707.30 | 3615.57 | 1222.00 | 2386.00 |
| 6.6kV | 825.43 | 839.67 | 969.34 | 878.00 | 97.00 |
| 230/400V | 1823.60 | 1707.08 | 1709.21 | 1106.00 | 605.00 |
| Total | 8052.61 | 6774.53 | 6810.32 | 3472.00 | 3326.00 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1998, No 151
NZLII —
NZ Gazette 1998, No 151
β¨ LLM interpretation of page content
π
Powerco Limited Financial Statements Certification
(continued from previous page)
π Trade, Customs & Industry11 May 1998
Powerco Limited, Financial Statements, Credit Risk, Interest Rate Risk, Electricity Purchases, Related Party Transactions
π Disclosure of Optimal Deprival Value (ODV) for Powerco Limited
π Trade, Customs & IndustryODV, Electricity, Powerco Limited, Financial Disclosure
π Disclosure of Performance Measures for Powerco Limited
π Trade, Customs & IndustryPerformance Measures, Electricity, Powerco Limited, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Overhead Line Length