✨ Electricity Performance Measures




NEW ZEALAND GAZETTE

8 AUGUST

2047

THE POWER COMPANY LIMITED

ENERGY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS

(LINE BUSINESS)

PURSUANT TO REGULATION 15
ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

9.0 ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES

1997 1996 1995
(a) Maximum Demand 99,402kW 99,205kW 94,517kW
(b) Total kWh Received 551,118,931kWh 535,239,443kWh 529,593,400kWh
(c) Total kWh Delivered 502,652,199kWh 477,237,204kWh 489,845,671kWh
(d) Total kWh Conveyed 72,661,938kWh 130,670,908kWh 11,543,308kWh
(e) Load Factor 63% 62% 64%

Percentage of electrical energy entering the transmission system over maximum demand time hours per year.

1997 1996 1995
(f) Loss Ratio 8.8% 11% 8%

Transmission losses over energy entering the system.

1997 1996 1995
(g) Capacity Utilisation 37% 38% 40%

Maximum demand over total transformer capacity.

10.0 STATISTICS

System length, broken by voltage.

Voltage Total (km) Overhead (km) Underground (km)
1997 1996 1995 1997 1996 1995
66kV 252.15 239.30 239.30 252.15 239.30 239.30
33kV 456.75 468.85 456.00 456.00 468.10 456.00
11kV 6445.04 6441.08 6435.12 6402.29 6399.26 6394.56
6.6kV 0.59 0.59 0.59 0.59 0.59 0.59
400kV 1113.82 1107.87 1107.22 1013.81 1012.11 1011.46
TOTAL 8268.35 8257.69 8251.08 8124.25 8118.77 8113.42
1997 1996 1995
Average Transformer Capacity 269,879kVA 260,772kVA 239,249kVA


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


NZLII PDF NZ Gazette 1997, No 84





✨ LLM interpretation of page content

🏭 Energy Efficiency Performance Measures and Statistics by The Power Company Limited (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Energy Efficiency, Performance Measures, Statistics, Transmission System, Line Business