β¨ Water-race Construction Notices
894
THE NEW ZEALAND GAZETTE.
[No. 57
Any person objecting to the granting of this appli-
cation must lodge his objection in writing at the
Warden's Office at Hokitika, within thirty clear days
from the date hereof.
Hearing at 11 o'clock, on the 5th July, 1882.
M. F. SOUTH,
Mining Registrar.
Warden's Office,
Hokitika, 1st June, 1882. 439
To the Mining Registrar at Naseby of the Mount
Ida Mining District, and all other persons whom it
may concern.
TAKE notice that it is intended to construct two
Dam-banks and form two Reservoirs for the
storage of water for industrial purposes, and also to
construct a Water-race connecting the said two
reservoirs; and that the following are the particulars
respecting such reservoirs and water-race :--
RESERVOIR NO. 1.
Locality: Immediately below Government reser-
voir in Roach's Gully, near Naseby.
Length of dam: 7 chains.
Greatest height: 6 feet.
Greatest breadth of base: 36 feet.
Area of reservoir: 1 acre.
Estimated time for construction: Six months.
RESERVOIR NO. 2.
Locality: On west boundary of Borough of Nase-
by, at junction of Derg and Holywood Streets, out-
side the borough.
Length of dam: 6 chains.
Greatest height: 6 feet.
Greatest breadth of base: 24 feet.
Area of reservoir: 2 acres.
Estimated time for construction: Six months.
WATER-RACE.
Commencing at Reservoir No. 1, and terminating
at Reservoir No. 2; 13 chains long, 18 inches wide,
18 inches broad; to carry six heads of water, and to
be completed within six months.
Dated this 1st day of June, 1882.
THE BOROUGH OF NASEBY,
(By its Solicitor, G. F. ROWLATT.)
All objections to the above application must be
lodged with the Mining Registrar, Naseby, within
thirty days from this date.
Hearing at the Warden's Office, Naseby, on the
first Warden's Court-day in July, 1882.
Dated this 2nd day of June, 1882.
442
JOHN F. GARVEY,
Mining Registrar.
To the Mining Registrar at Queenstown, Otago Gold
Fields District and Mining District of Wakatipu,
and all other persons whom it may concern.
TAKE notice that it is intended to construct a
Water-race and divert water from a point near
the intersection of the Arrow and Queenstown Roads
or Tracks, Skipper's Road.
The said race will cross public roads and through
Crown property, and terminate at Section No. 93,
Block XIX., Shotover Survey District, and will take
in any storm-water channels coming from the Coronet
Range and its sides, and is required for wool-washing
purposes.
Mean depth: 1 foot.
Mean width: 18 inches.
Time for construction: Six months.
Length: About four miles.
Carrying capacity: Two heads.
JOHN WELDON GOODBODY.
Dated at Queenstown, this 8th day of June, 1882.
Any person objecting to the granting of this appli-
cation must lodge his objection in writing at the
Warden's Office, Queenstown, within thirty clear
days from the date hereof.
459
OWEN MACKIN,
Mining Registrar.
NOTICE OF INTENTION TO CONSTRUCT A WATER-
RACE.
Tuapeka, 8th May, 1882.
To the Warden at Lawrence.
I HEREBY give notice that I intend to construct a
Water-race for mining purposes, commencing at
a point situate 300 yards from the south end of the
lagoon at the head of Gabriel's Gully, and terminating
at the Company's special claim.
The length of such race is half a mile or thereabouts,
and its intended course is southerly; the mean
breadth of such race is 2 feet 6 inches, and the mean
depth is 2 feet 6 inches; and it is proposed to divert
six sluice-heads of water; and the time estimated for
the completion of such race is three months.
BLUESPUR AND GABRIEL'S GULLY SLUICING
COMPANY (LIMITED),
(By J. C. ARBUCKLE, Manager.)
Date and number of miner's right: 8th May,
1882, No. 32336.
Any person objecting to the granting of the above
application must lodge his objection in writing at the
Warden's Office at Lawrence fourteen clear days
previous to the date of hearing.
Hearing at Lawrence, at 11 o'clock, on Friday, the
14th July, 1882.
H. J. ABEL,
Mining Registrar's Office,
Lawrence, 8th May, 1882.
Mining Registrar.
466
NOTICE OF INTENTION TO CONSTRUCT A WATER-
RACE.
Tuapeka, 8th May, 1882.
To the Warden at Lawrence.
I HEREBY give notice that I intend to construct
a Water-race to divert and use water for mining
purposes, commencing at a point about a mile from
the Victory Company's shaft in Nuggetty Creek, and
terminating at the northern boundary of the Com-
pany's claim.
The length of such race is one mile or thereabouts,
and its intended course is north-west; the mean
depth of such race is 1 foot, and the mean breadth is
1 foot; and it is proposed to divert one sluice-head
of water; and the estimated time for the completion
of such race is three months.
VICTORY QUARTZ-MINING CO. (LIMITED),
Waipori,
(By J. C. ARBUCKLE, Manager.)
Date and number of miner's right: 8th May,
1882, No. 32337.
Any person objecting to the granting of the above
application must lodge his objection in writing at
the Warden's office at Lawrence fourteen clear days
previous to the date of hearing.
Hearing at Lawrence, at 11 o'clock, on Friday, the
14th July, 1882.
H. J. ABEL,
Mining Registrar.
Mining Registrar's Office,
Lawrence, 8th May, 1882.
467
Next Page →
β¨ LLM interpretation of page content
πΎ
Notice of Intention to Construct Water-race
(continued from previous page)
πΎ Primary Industries & Resources1 June 1882
Mining, Water-race, Naseby, Reservoirs
- M. F. South, Mining Registrar
πΎ Notice of Intention to Construct Water-race and Reservoirs
πΎ Primary Industries & Resources2 June 1882
Mining, Water-race, Naseby, Reservoirs, Construction
- John F. Garvey, Mining Registrar
πΎ Notice of Intention to Construct Water-race
πΎ Primary Industries & Resources8 June 1882
Mining, Water-race, Queenstown, Construction
- John Weldon Goodbody, Intends to construct water-race
- Owen Mackin, Mining Registrar
πΎ Notice of Intention to Construct Water-race
πΎ Primary Industries & Resources8 May 1882
Mining, Water-race, Lawrence, Construction
- J. C. Arbuckle (Manager), Intends to construct water-race
- H. J. Abel, Mining Registrar
πΎ Notice of Intention to Construct Water-race
πΎ Primary Industries & Resources8 May 1882
Mining, Water-race, Lawrence, Construction
- J. C. Arbuckle (Manager), Intends to construct water-race
- H. J. Abel, Mining Registrar
NZ Gazette 1882, No 57