β¨ Operational Control Centre Responsibilities
5 JULY 2011
NEW ZEALAND GAZETTE, No. 93
2729
CC INTERACTION SCHEMATIC - Operational Control Centre Responsibilities
| Tekapo Chain Offering and Dispatch | Meridian Hydro Operations | Genesis Control Centre (GCC) | Genesis Trading | System Operator |
|---|
At dispatch (t=0)
- Dispatch Rules
- Rate of ramp/tunnel insertion?
- Valid instruction? β Dispatch by Trading Period
At Gate (t=2hrs)
At Close
Day Ahead (before 1330hrs)
- OTA/Waitaki block schedule
One Month Out
- Dispatch Rules
Dispatch Rules
Upstream Dispatch Rules
- Request Re-dispatch
Re-dispatch on bond side
Revised Dispatch Schedule
Unit Commitment
Day ahead offer
Aggregate SI Schedule
Pre-dispatch Schedule
Dispatch Schedule
Hydro optimisation
Next Page →
β¨ LLM interpretation of page content
ποΈ
Operational Responsibilities and Instructions
(continued from previous page)
ποΈ Infrastructure & Public WorksOperational control, Dispatch Rules, Electricity Code, Meridian Energy, Genesis Energy, GCC
NZ Gazette 2011, No 93