✨ Operational Instructions and Responsibilities




2728 NEW ZEALAND GAZETTE, No. 93 5 JULY 2011

RESPONSIBILITIES

  1. Offering plant into market

    • in compliance with approved operating modes ("Dispatch Rules").
    • in compliance with Electricity Code.
    • not to include offering for SI frequency management.
    • should consider trading needs and dispatch requirements during islanded operation of TKA – resultant MW swings at TKB should be contemplated.
  2. Maintain controlled documentation of Dispatch Rules.

INSTRUCTIONS

  1. Instruct Meridian Energy to initiate any non-generation flows, such as bypass and spill.

  2. Following all Valid Instructions, which are dispatch instructions:

    • that comply with the Dispatch Rules
    • that will not put at risk safety of persons, integrity of plant or resource consent compliance.
  3. Meridian to advise GCC of any dispatch instructions received that are not Valid Instructions and to take further operating instruction from GCC.

  4. MEL face no liability from following Valid Instructions or instructions directly from GCC.

  5. Meridian Energy to apply good practice and follow prudent action to avoid risks to safety of persons, integrity of plant or resource consents compliance.

  6. All operators are trained in the Dispatch Rules and appropriate actions resulting.

  7. Action flow requests in a prompt and reasonable manner.

  8. Monitor and advise Genesis Energy of any storage or flow risk emerging in real time arising from such a flow request.



Next Page →



Online Sources for this page:

Gazette.govt.nz PDF NZ Gazette 2011, No 93





✨ LLM interpretation of page content

πŸ—οΈ Operational Responsibilities and Instructions

πŸ—οΈ Infrastructure & Public Works
Operational control, Dispatch Rules, Electricity Code, Meridian Energy, Genesis Energy, GCC