Statistics (Schedule 1, Part 4)

Statistics

Nominal Voltage 2007 2006 2005 2004
System Length (Total) (kms)
50kV 299.99 295.75 293.91 293.30
33kV 34.41 34.39 34.39 34.40
11kV 2,548.96 2,561.24 2,573.62 2,575.65
230/400 V 763.89 775.26 769.88 725.95
Total 3,647.25 3,666.64 3,671.80 3,629.30

| Circuit Length (Overhead) (kms) | | | | | |
| | 50kV | 298.65 | 294.93 | 293.91 | 293.30 |
| | 33kV | 34.34 | 34.32 | 34.32 | 34.30 |
| | 11kV | 2,419.83 | 2,437.91 | 2,448.80 | 2,453.65 |
| | 230/400 V | 553.25 | 567.90 | 573.18 | 538.40 |
| | Total | 3,306.07 | 3,335.06 | 3,350.21 | 3,319.65 |

| Circuit Length (Underground) (kms) | | | | | |
| | 50kV | 1.34 | 0.82 | 0.00 | 0.00 |
| | 33kV | 0.07 | 0.07 | 0.07 | 0.10 |
| | 11kV | 129.13 | 123.33 | 124.82 | 122.00 |
| | 230/400 V | 210.64 | 207.36 | 196.70 | 187.55 |
| | Total | 341.18 | 331.58 | 321.59 | 309.65 |

| Transformer Capacity | | | | | |
| | in kVA | 207,120 | 200,520 | 197,711 | 190,763 |

| Maximum Demand | | | | | |
| | in kW | 59,212 | 58,894 | 55,699 | 53,847 |

| Total Electricity entering the System, before losses of electricity (kWh) | | 310,110,104 | 302,358,736 | 306,333,406 | 296,456,944 |

| Total amount of electricity conveyed through the system, after losses of electricity, on behalf of each person that is an electricity generator or electricity retailer or both: | Name of retailer/generator | |
| | Contact Energy Ltd | 162,996,988 | 164,054,061 | 169,852,670 | 162,920,804 |
| | Mercury Energy Ltd (Mighty River) | 31,019,777 | 28,564,857 | 24,012,438 | 12,857,080 |
| | Trustpower Ltd | 35,668,904 | 40,248,140 | 40,403,654 | 41,054,204 |
| | Meridian Energy Ltd | 17,692,325 | 16,020,077 | 14,058,206 | 18,071,846 |
| | Genesis Energy Ltd | 43,543,943 | 34,274,945 | 38,930,950 | 39,085,849 |
| | TOTAL | 290,921,937 | 283,162,080 | 287,257,918 | 273,989,783 |

| Total number of consumers | Number | 24,962 | 24,864 | 24,856 | 24,876 |



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2008, No 55


Gazette.govt.nz PDF NZ Gazette 2008, No 55





✨ LLM interpretation of page content

πŸ—οΈ Energy Delivery Efficiency Performance Measures (continued from previous page)

πŸ—οΈ Infrastructure & Public Works
Statistics, Electricity, System Length, Circuit Length, Transformer Capacity, Maximum Demand, Consumers