β¨ Efficiency Performance Measures
Efficiency Performance Measures (Schedule 1, Part 3)
|
2007 |
2006 |
2005 |
2004 |
| Direct line costs per kilometre |
799 |
647 |
675 |
744 |
| Direct expenditure |
2,913,212 |
2,372,204 |
2,477,409 |
2,698,961 |
| System length |
3,647.26 |
3,668.64 |
3,671.80 |
3,629.30 |
|
2007 |
2006 |
2005 |
2004 |
| Indirect line costs per consumer |
87 |
77 |
70 |
61 |
| Indirect expenditure |
2,182,406 |
1,922,798 |
1,733,061 |
1,507,781 |
| Total consumers |
24,962 |
24,864 |
24,856 |
24,876 |
Energy Delivery Efficiency Performance Measures (Schedule 1, Part 4)
|
2007 |
2006 |
2005 |
2004 |
| Load Factor (= [a/bc]*100/1) |
59.79% |
61.75% |
62.78% |
62.68% |
| where - |
|
|
|
|
| a = kWh of electricity entering system during the financial year |
310,110,104 |
302,358,736 |
308,333,406 |
296,456,944 |
| (this figure should be same as the total for (g) from Statistics) |
| b = Maximum Demand |
59,212 |
65,894 |
55,699 |
53,847 |
| c = Total number of hours in financial year |
8760 |
8760 |
8760 |
8,784 |
|
2007 |
2006 |
2005 |
2004 |
| Loss Ratio (= a/b*100/1) |
6.19% |
6.35% |
6.23% |
7.58% |
| where - |
|
|
|
|
| a = losses in electricity in kWh |
19,188,167 |
19,196,666 |
19,075,488 |
22,467,461 |
| (this figure should be the difference between (f) and (g) from Statistics) |
| b = kWh of electricity entering system during the financial year |
310,110,104 |
302,358,736 |
308,333,406 |
296,456,944 |
|
2007 |
2006 |
2005 |
2004 |
| Capacity Utilisation (= a/b*100/1) |
28.59% |
27.87% |
28.17% |
28.23% |
| where - |
|
|
|
|
| a = Maximum Demand |
59,212 |
55,894 |
55,699 |
53,847 |
| b = Transformer Capacity |
207,120 |
200,520 |
197,711 |
190,763 |
Next Page →
Online Sources for this page:
β¨ LLM interpretation of page content
ποΈ
Efficiency Performance Measures for Direct and Indirect Line Costs
ποΈ Infrastructure & Public Works
Direct line costs, Indirect line costs, System length, Consumers, Expenditure
ποΈ
Energy Delivery Efficiency Performance Measures
ποΈ Infrastructure & Public Works
Load Factor, Loss Ratio, Capacity Utilisation, Electricity, Maximum Demand