NEW ZEALAND GAZETTE, No. 21
13 FEBRUARY 2008
Buller Electricity Limited
Line Business Performance Measures
| 2007 | 2006 | 2005 | 2004 | |
|---|---|---|---|---|
| CAIDI | ||||
| 16 The CAIDI for the total number of interruption | 110 | 104 | 100 | 107 |
| 17 CAIDI targets for 2007/2008 | ||||
| Class B - Planned by Line Owners | 184 | 200 | ||
| Class C - Unplanned by Line Owners | 86 | 88 | ||
| 18 Average CAIDI Target for 2008/2012 years | ||||
| Class B - Planned by Line Owners | 203 | 173 | ||
| Class C - Unplanned by Line Owners | 71 | 83 | ||
| 19 The CAIDI for the total number of interruptions within each interruption class | ||||
| Class A - Planned by Transpower | 0 | 0 | 0 | 0 |
| Class B - Planned by Buller Electricity | 261 | 176 | 145 | 163 |
| Class C - Unplanned by Buller Electricity | 60 | 71 | 84 | 69 |
| Class D - Unplanned by Transpower | 99 | 42 | 0 | 0 |
| Class E - Unplanned by Line Owner generation | 0 | 0 | 0 | 0 |
| Class F - Unplanned by other generator | 0 | 0 | 0 | 0 |
| Class G – Unplanned – by another Line Owner | 0 | 0 | 0 | 0 |
| Class H – Planned – by another Line Owner | 0 | 0 | 0 | 0 |
| Class I - Any Other Loss of Supply | 0 | 0 | 40 | 45 |
| 110 | 104 | 100 | 107 |
Note: The totals in clause 19 are not designed to sum the figures above each total.
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2008, No 21
Gazette.govt.nz —
NZ Gazette 2008, No 21
✨ LLM interpretation of page content
🏭
Buller Electricity Limited Line Business Performance Measures
(continued from previous page)
🏭 Trade, Customs & IndustryElectricity, Performance Measures, Interruptions, Faults, Reliability, Buller Electricity Limited