Electricity Performance Measures




NEW ZEALAND GAZETTE, No. 140

24 AUGUST 2005

2005 2004 2003 2002
(d) Transformer capacity (kVA) 779,835 758,211 740,166 725,937
(e) Maximum demand (kW) 266,859 246,190 271,850 262,700
(f) Total electricity supplied before losses from the system (kWh) 1,344,545,511 1,269,877,041 1,300,088,384 1,240,262,196

(g) Electricity conveyed after losses for each party (kWh)

Party 2005 2004 2003 2002
Party 1 579,997,179 559,134,598 549,017,685 476,920,650
Party 2 386,155,577 372,571,922 404,561,670 415,684,154
Party 3 223,143,337 214,527,945 198,173,212 175,438,820
Party 4 33,675,391 4,623,330 29,942,765 21,637,496
Party 5 20,743,856 20,742,113 28,311,598 20,808,949
Party 6 16,588,984 15,450,111 6,669,156 10,245,858
Party 7 1,998,497 2,302,073 2,619,514 2,882,468
Party 8 321,934 36,594 - -
Party 9 - - 9,072 19,288
Party 10 - - - 36,562,064
Party 11 - - - 448,257
Party 12 - - - 321,492

| (h) Total consumers | 75,117 | 73,972 | 72,794 | 71,431 |

Disclosure of reliability performance measures under requirement 21 of the Electricity Information Disclosure Requirements 2004

  1. Total number of interruptions
Class 2005 2004 2003 2002
Class A – planned by Transpower 0 0 0 0
Class B – planned by line owners 269 293 341 228
Class C – unplanned by line owners 445 453 464 390
Class D – unplanned by Transpower 0 1 3 1
Class E – unplanned by embedded generation 0 0 1 0
Class F – unplanned by generation on other networks 0 0 0 0
Class G – unplanned by other line owner 0 0 0 0
Class H – planned by another line owner 0 0 0 0
Class I – any other loss of supply 0 0 0 0
  1. No of interruption targets for next financial year
Class 2005 2004 2003 2002
Class B – planned by line owners 300 300 250 200
Class C – unplanned by line owners 450 450 430 350
  1. Average no of interruption targets for next 5 years
Class 2005 2004 2003 2002
Class B – planned by line owners 280 280 230 190
Class C – unplanned by line owners 440 420 390 350
  1. Proportion of Class C interruptions not restored within
Time 2005 2004 2003 2002
3 hours 16.63% 16.56% 13.7% 11.0%
24 hours 0.0% 0.9% 0.2% 0.0%
  1. (a) and (d) The total number of faults per 100 circuit kilometres of prescribed voltage electric line
Voltage 2005 2004 2003 2002
66 kV 1.8 1.8 - -
33 kV 5.4 3.4 4.4 2.2
11 kV 12.4 12.6 12.2 11.0
6.6 kV 7.0 6.0 6.9 5.1
Total 10.0 9.5 9.6 8.0


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2005, No 140


Gazette.govt.nz PDF NZ Gazette 2005, No 140





✨ LLM interpretation of page content

🏭 Performance Measures for Aurora Energy Limited (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Financial Performance, Efficiency, Energy Delivery, System Length

🏭 Electricity conveyed after losses for each party

🏭 Trade, Customs & Industry
Electricity, Energy Delivery, Consumption, Statistical Data