✨ Utility Performance Statistics




18 JANUARY 2005
NEW ZEALAND GAZETTE, No. 12
269

Scanpower Limited
Performance Measures Continued
For the Year Ended 31 March 2004

Line Voltage / Target 2005 2005/2009
11kV 13.39 8.23

Sub Requirement 6.
Faults per 100 Circuit Kilometres (Underground)

Line Voltage 2004 2003 2002 2001 2000
11kV Underground 0 0 0 0 0

Sub Requirement 7.
Faults per 100 Circuit Kilometres (Overhead)

Line Voltage 2004 2003 2002 2001 2000
11kV Overhead 17.27 5.59 8.58 9.42 6.29

Sub Requirement 8. 9. 10. 11.
SAIDI Results by Class and Targets

Class A B C D E F G TOTAL
2004 SAIDI 0.00 33.96 151.24 0.00 0.00 0.00 0.00 185.20
2003 SAIDI 28.44 24.80 57.23 0.00 0.00 0.00 0.00 110.47
2002 SAIDI 56.12 60.03 32.21 17.00 0.00 0.00 0.00 165.36
2001 SAIDI 0.00 40.87 29.34 0.00 0.00 0.00 0.00 70.21
2000 SAIDI 56.38 47.50 18.64 0.00 0.00 0.00 0.00 122.52
Class / Target 2005 2005/2009
SAIDI Class B 62.32 58.58
SAIDI Class C 20.77 19.52

Sub Requirement 12. 13. 14. 15.
SAIFI Results by Class and Targets

Class A B C D E F G TOTAL
2004 SAIFI 0.00 0.26 1.41 0.00 0.00 0.00 0.00 1.67
2003 SAIFI 0.24 0.18 0.56 0.00 0.00 0.00 0.00 0.98
2002 SAIFI 0.23 0.46 0.67 0.57 0.00 0.00 0.00 1.93
2001 SAIFI 0.00 0.31 0.55 0.00 0.00 0.00 0.00 0.86
2000 SAIFI 0.24 0.35 0.32 0.00 0.00 0.00 0.00 0.91
Class / Target 2005 2005/2009
SAIFI Class B 0.70 0.67
SAIFI Class C 0.23 0.22


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2005, No 12


Gazette.govt.nz PDF NZ Gazette 2005, No 12





✨ LLM interpretation of page content

πŸ’° Reliability Performance Measures for Scanpower Limited (continued from previous page)

πŸ’° Finance & Revenue
Reliability Performance, Interruptions, Faults, Circuit Kilometres, Restoration Time, SAIDI, SAIFI