β¨ Electricity Performance Measures
Scanpower Limited
Performance Measures Continued
For the Year Ended 31 March 2004
Ref
Description
2004
2003
2002
2001
2000
Retailer 6
0
0
90,095
237
0
Retailer 7
0
0
0
1,346,470
0
Total
86,686,126
86,625,250
82,456,432
81,083,211
79,097,162
2 h
Total Consumers (Average for the Year)
6,719
6,638
6,615
6,707
6,675
Part 5. Requirement 21 (Reliability Performance Measures)
Sub Requirement 1.
Total Number of Interruptions by Class
Year
A
B
C
D
E
F
G
TOTAL
Total Interruptions 2004
0.00
97.00
129.00
0.00
0.00
0.00
0.00
226.00
Total Interruptions 2003
1.00
82.00
65.00
0.00
0.00
0.00
0.00
148.00
Total Interruptions 2002
1.00
102.00
65.00
1.00
0.00
0.00
0.00
169.00
Total Interruptions 2001
0.00
116.00
72.00
0.00
0.00
0.00
0.00
188.00
Total Interruptions 2000
1.00
105.00
48.00
0.00
0.00
0.00
0.00
154.00
Sub Requirement 2. (a) & (b)
Interruption Targets for the Following Year
Target Description
2005
2004
2003
2002
2001
Planned Interruption Target (Class B)
100
90
100
150
150
Unplanned Interruption Target (Class C)
62
70
100
150
150
Sub Requirement 3.
Average Interruption Targets for Following and Subsequent 4 years
Target Description
2005/2009
2004/2008
2003/2007
2002/2006
2001/2005
Planned Interruption Target (Class B)
100
90
100
150
150
Unplanned Interruption Target (Class C)
62
70
100
150
150
Sub Requirement 4. (a) & (b)
Percentage Proportion of Total Number of Class C Interruptions by Time
Restoration Time
2004
2003
2002
2001
2000
3 Hours
32.6%
18.5%
4.6%
21.0%
17.0%
24 Hours
3.9%
0.0%
0.0%
0.0%
0.0%
Sub Requirement 5. (a) (b) (c) & (d)
Faults per 100 Circuit Kilometres (Actual and Target)
Line Voltage
2004
2003
2002
2001
2000
11kV
17.27
8.58
8.58
9.42
6.29
Next Page →
Online Sources for this page:
β¨ LLM interpretation of page content
π°
Financial and Efficiency Performance Measures for Scanpower Limited
(continued from previous page)
Domain π° Finance & Revenue
Keywords Financial Performance, Efficiency Measures, Return on Funds, Return on Equity, Return on Investments, Direct Line Cost, Indirect Line Cost, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Circuit Length, Transformer Capacity, Maximum Demand, Electricity Supplied, Total Consumers