Scanpower Limited

Performance Measures Continued

For the Year Ended 31 March 2004

Ref Description 2004 2003 2002 2001 2000
Retailer 6 0 0 90,095 237 0
Retailer 7 0 0 0 1,346,470 0
Total 86,686,126 86,625,250 82,456,432 81,083,211 79,097,162
2 h Total Consumers (Average for the Year) 6,719 6,638 6,615 6,707 6,675

Part 5. Requirement 21 (Reliability Performance Measures)

Sub Requirement 1.

Total Number of Interruptions by Class

Year A B C D E F G TOTAL
Total Interruptions 2004 0.00 97.00 129.00 0.00 0.00 0.00 0.00 226.00
Total Interruptions 2003 1.00 82.00 65.00 0.00 0.00 0.00 0.00 148.00
Total Interruptions 2002 1.00 102.00 65.00 1.00 0.00 0.00 0.00 169.00
Total Interruptions 2001 0.00 116.00 72.00 0.00 0.00 0.00 0.00 188.00
Total Interruptions 2000 1.00 105.00 48.00 0.00 0.00 0.00 0.00 154.00

Sub Requirement 2. (a) & (b)

Interruption Targets for the Following Year

Target Description 2005 2004 2003 2002 2001
Planned Interruption Target (Class B) 100 90 100 150 150
Unplanned Interruption Target (Class C) 62 70 100 150 150

Sub Requirement 3.

Average Interruption Targets for Following and Subsequent 4 years

Target Description 2005/2009 2004/2008 2003/2007 2002/2006 2001/2005
Planned Interruption Target (Class B) 100 90 100 150 150
Unplanned Interruption Target (Class C) 62 70 100 150 150

Sub Requirement 4. (a) & (b)

Percentage Proportion of Total Number of Class C Interruptions by Time

Restoration Time 2004 2003 2002 2001 2000
3 Hours 32.6% 18.5% 4.6% 21.0% 17.0%
24 Hours 3.9% 0.0% 0.0% 0.0% 0.0%

Sub Requirement 5. (a) (b) (c) & (d)

Faults per 100 Circuit Kilometres (Actual and Target)

Line Voltage 2004 2003 2002 2001 2000
11kV 17.27 8.58 8.58 9.42 6.29


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2005, No 12


Gazette.govt.nz PDF NZ Gazette 2005, No 12





✨ LLM interpretation of page content

πŸ’° Financial and Efficiency Performance Measures for Scanpower Limited (continued from previous page)

πŸ’° Finance & Revenue
Financial Performance, Efficiency Measures, Return on Funds, Return on Equity, Return on Investments, Direct Line Cost, Indirect Line Cost, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Circuit Length, Transformer Capacity, Maximum Demand, Electricity Supplied, Total Consumers

πŸ’° Reliability Performance Measures for Scanpower Limited

πŸ’° Finance & Revenue
Reliability Performance, Interruptions, Faults, Circuit Kilometres, Restoration Time