✨ Electricity Reliability Statistics
13 JANUARY
NEW ZEALAND GAZETTE
71
| Lines | Cable | Total | |
|---|---|---|---|
| Nominal Voltage | Faults per 100 km | Faults per 100 km | Faults per 100 km |
| 33 kV | 0.35 | 0.00 | 0.34 |
| 11 kV | 3.34 | 0.00 | 3.23 |
| TOTALS | 3.06 | 0.00 | 2.97 |
| Faults/100km | Faults/100km 33kV | Faults/100km 11kV | |
|---|---|---|---|
| Target 31/03/2004 | 2.28 | 0.70 | 2.39 |
| 31/03/2004 Avg forecast | 2.42 | 1.03 | 2.51 |
| 31/03/2005 Avg forecast | 2.15 | 0.70 | 2.25 |
| 31/03/2006 Avg forecast | 2.21 | 0.70 | 2.33 |
| 31/03/2007 Avg forecast | 2.02 | 0.70 | 2.11 |
| 31/03/2008 Avg forecast | 2.07 | 0.70 | 2.19 |
A8. The SAIDI, SAIFI, CAIDI for the total number of interruptions.
SAIDI targets for the following financial year for-
(a) Planned interruptions by the line owner (Class B); and
(b) Unplanned interruptions originating within the works of the line owner (Class C).
Average SAIDI targets for the following financial year and the subsequent 4 financial years for each of-
(a) Planned interruptions by the line owner (Class B); and
(b) Unplanned interruptions originating within the works of the line owner (Class C).
The SAIDI for the total number of interruptions within each interruption class.
| NETWORK OR GENERATION OWNER | Disc Reg Class | CLASSIFICATION OF INTERRUPTIONS | SAIDI | SAIFI | CAIDI |
|---|---|---|---|---|---|
| Numerator (Cust·min) | Result (min/Conn Cust) | Numerator (Cust·int) | |||
| MainPower | B | Planned Shut-downs | 1594843 | 60.83 | 6745 |
| C + G | Unplanned Interruptions | 2041793 | 77.87 | 38264 | |
| Subtotal | 3636636 | 138.70 | 44949 | ||
| Trans Power | A | Planned Shut-downs | 1950255 | 74.38 | 5037 |
| D | Unplanned Interruptions | 1868576 | 71.27 | 20754 | |
| Subtotal | 3818831 | 145.65 | 25791 | ||
| Other | G | Other Interruptions | 0 | 0.00 | 0 |
| Other | E | Unplanned Interruptions | 0 | 0.00 | 0 |
| Subtotal | 0 | 0.00 | 0 | ||
| TOTAL | 7455467 | 284.35 | 70740 |
Common Denominator = No of Cust.
26219.5
| Class B | SAIDI | SAIFI | CAIDI |
|---|---|---|---|
| Target 31/03/2004 | 61 | 0.24 | 254 |
| 31/03/2004 Avg forecast | 81 | 0.32 | 252 |
| 31/03/2005 Avg forecast | 94 | 0.33 | 285 |
| 31/03/2006 Avg forecast | 74 | 0.28 | 264 |
| 31/03/2007 Avg forecast | 67 | 0.28 | 240 |
| 31/03/2008 Avg forecast | 64 | 0.27 | 237 |
| Class C | SAIDI | SAIFI | CAIDI |
|---|---|---|---|
| Target 31/03/04 | 47 | 0.99 | 48 |
| 31/03/2004 Avg forecast | 40 | 0.63 | 64 |
| 31/03/2005 Avg forecast | 35 | 0.55 | 64 |
| 31/03/2006 Avg forecast | 33 | 0.53 | 62 |
| 31/03/2007 Avg forecast | 31 | 0.50 | 62 |
| 31/03/2008 Avg forecast | 33 | 0.52 | 64 |
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2004, No 3
Gazette.govt.nz —
NZ Gazette 2004, No 3
✨ LLM interpretation of page content
🏭
MainPower New Zealand Limited Information Disclosure Update
(continued from previous page)
🏭 Trade, Customs & IndustryElectricity, Reliability, Performance Measures, Interruptions, Faults, SAIDI, SAIFI, MainPower, Trans Power