✨ Reliability Performance Measures




11 JULY

NEW ZEALAND GAZETTE

2113

WAIPA NETWORKS LIMITED - LINES BUSINESS

2003 2002 2001 2000
16 The CAIDI for the total number of interruptions 59 97 69

17 CAIDI targets for 2003 / 2004

  • Class B - Planned - by Waipa Networks: 250
  • Class C - Unplanned - by Waipa Networks: 66

18 Average CAIDI Target for 2003 / 2004 to 2007 / 2008 years

  • Class B - Planned - by Waipa Networks: 250
  • Class C - Unplanned - by Waipa Networks: 64

19 The CAIDI for the total number of interruptions within each interruption class

Class 2003 2002 2001 2000
Class A - Planned - by Transpower 0 0 0 0
Class B - Planned - by Waipa Networks 232 245 215 150
Class C - Unplanned - by Waipa Networks 50 76 53 90
Class D - Unplanned - by Transpower 8 35 46 6
Class E - Unplanned - by Line Owner genera 0 0 0 0
Class F - Unplanned - by other generation 0 0 0 0
Class G - Unplanned - by another line owner 65 92 42 0
Class H - Planned - by another line owner 0 0 0 0
Class I - Any other loss of supply 0 0 0 0


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 79


Gazette.govt.nz PDF NZ Gazette 2003, No 79





✨ LLM interpretation of page content

πŸ’° Disclosure of Reliability Performance Measures for Waipa Networks Limited (continued from previous page)

πŸ’° Finance & Revenue
Reliability Performance Measures, Electricity, Interruptions, Faults, Waipa Networks Limited, CAIDI, Targets