✨ Gas Reliability Performance Measures
23 MAY NEW ZEALAND GAZETTE 1425
3.3 RELIABILITY PERFORMANCE MEASURES (con’t)
b) The measure of unplanned interruptions directly resulting from unplanned interruptions of a transmission system calculated by the formula a/b where:
a = the sum obtained by adding together the number of customer-hours lost during each interruption; and
b = the total number of customers being supplied by means of the system.
| System | Unplanned interruption measure (resulting from transmission interruptions) |
|---|---|
| Jan 02-Dec 02 | |
| Alfriston | - |
| Ashhurst | - |
| Auckland Central | - |
| Bruce McLaren | - |
| Dannevirke | - |
| Drury | - |
| Feilding | - |
| Foxton | - |
| Hastings | - |
| Hunua | - |
| Kakariki | - |
| Kairanga | - |
| Kingseat | - |
| Levin | - |
| Longburn | - |
| Mangaroa | - |
| Mangatainoka | - |
| Oroua Downs | - |
| Pahiatua | - |
| Palmerston North | - |
| Pukekohe | - |
| Ramarama | - |
| Takapau | - |
| Tuakau | - |
| Waiuku | - |
| Wellington | - |
PUBLISHED BY THE
DEPARTMENT OF INTERNAL AFFAIRS
PRINTED BY WICKLIFFE LIMITED
ISSN 0111-5650
Price $5.00 (inc. G.S.T.)
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2003, No 54
Gazette.govt.nz —
NZ Gazette 2003, No 54
✨ LLM interpretation of page content
🏭
UnitedNetworks Limited Gas Information Disclosure
(continued from previous page)
🏭 Trade, Customs & Industry14 May 2003
Energy Delivery, Efficiency Measures, Load Factor, Gas Systems, Performance Statistics, System Length, Customer Numbers, Reliability Performance Measures, Unplanned Interruptions, Distribution Systems