✨ Gas Reliability Performance Measures




3.3 RELIABILITY PERFORMANCE MEASURES

For the 12 months ended 31 December 2002

Schedule 1 – PART 4

Unplanned Interruptions in Distribution Systems

a) The measure of unplanned interruptions (other than those directly resulting from unplanned interruptions of a transmission system) calculated by the formula a/b where:

a = the sum obtained by adding together the number of customer-hours lost during each interruption; and

b = the total number of customers being supplied by means of the system.

System Unplanned interruption measure (within distribution system)
Jan 02-Dec 02
Alfriston -
Ashhurst #
Auckland Central 0.0024
Bruce McLaren -
Dannevirke #
Drury #
Feilding #
Foxton #
Hastings #
Hunua -
Kakariki -
Kairanga #
Kingseat -
Levin #
Longburn #
Mangaroa #
Mangatainoka #
Oroua Downs #
Pahiatua #
Palmerston North #
Pukekohe -
Ramarama -
Takapau -
Tuakau -
Waiau -
Waiuku -
Wellington 0.0040

On systems where the number of customers affected has been recorded, the duration of each interruption is not recorded and the local engineer has estimated the average length of the interruptions. Data indicated by # has been amalgamated into the Wellington system.

During 2002 Waimauku and Waiuku gates have been removed. Bruce McLaren has been interconnected with other Auckland Central Networks.



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 54


Gazette.govt.nz PDF NZ Gazette 2003, No 54





✨ LLM interpretation of page content

🏭 UnitedNetworks Limited Gas Information Disclosure (continued from previous page)

🏭 Trade, Customs & Industry
14 May 2003
Energy Delivery, Efficiency Measures, Load Factor, Gas Systems, Performance Statistics, System Length, Customer Numbers, Reliability Performance Measures, Unplanned Interruptions, Distribution Systems