Energy Delivery Statistics




1420 NEW ZEALAND GAZETTE No. 54

3.2 ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS (con't)

b) Maximum monthly

The maximum monthly amount of gas (in gigajoules) entering the system or systems.

System Max Month (GJ)
Jan 02-Dec 02
Alfriston 2,674
Ashhurst 1,212✓
Auckland Central 1,201,534
Bruce McLaren^ -
Dannevirke 11,118✓
Drury 5,697
Feilding 34,889✓
Foxton 6,417✓
Hastings 222,489✓
Hunua 11,926
Kakariki 7,014✓
Kairanga 1,024✓
Kingseat 267
Levin 37,429✓
Longburn 44,812✓
Mangaroa -
Mangatainoka 2,705✓
Oroua Downs 2,505✓
Pahiatua 48,376✓
Palmerston North 131,927✓
Pukekohe 3,737
Ramarama 2,770
Takapau 15,354✓
Tuakau 14,789
Waikuku^ -
Wellington 250,580✓

^ During 2002 Waimauku and Waikuku gates have been removed. Bruce McLaren has been interconnected with other Auckland Central Networks.

✓ UnitedNetworks sold the gas pipelines in Hawkes Bay, Palmerston North and Wellington to Power Co effective from 1 November 2002. This means that maximum monthly amount was during the period from 1 January 2002 - 31 October 2002.



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 54


Gazette.govt.nz PDF NZ Gazette 2003, No 54





✨ LLM interpretation of page content

🏭 UnitedNetworks Limited Gas Information Disclosure (continued from previous page)

🏭 Trade, Customs & Industry
14 May 2003
Energy Delivery, Efficiency Measures, Load Factor, Gas Systems, Performance Statistics, System Length