Energy Delivery Efficiency Performance Measures




23 MAY NEW ZEALAND GAZETTE 1419

3.2 ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS (con't)

a) System Length

The system length of each system, in kilometres as calculated by the formula a+b/2 where:

  • a = system length at the beginning of the financial year
  • b = system length at the end of the financial year
System Jan 02-Dec 02 Jan 01-Dec 01 Apr00-Dec00
Alfriston 0.032 0.143 0.254
Ashhurst 11.137√ 22.308 22.314
Auckland Central 4,709.510 4,457.733 4,280.361
Bruce McLaren^ 43.307 86.614 70.561
Dannevirke 10.012√ 18.267 16.560
Drury 9.004 9.004 8.916
Feilding 84.221√ 168.680 167.593
Foxton 16.773√ 33.512 33.389
Hastings 143.712√ 338.252 388.576
Hunua 2.389 2.210 2.053
Kakariki .950√ 1.901 1.712
Kairanga 3.672√ 7.345 7.342
Kingseat 6.439 6.439 6.450
Levin 102.881√ 207.558 207.716
Longburn 18.197√ 36.425 36.406
Mangaroa - 0.003 0.003
Mangatainoka .587√ 1.174 1.173
Oroua Downs 1.830√ 3.660 3.687
Pahiatua 6.012√ 12.033 11.984
Palmerston North 362.537√ 733.717 741.363
Pukekohe 14.510 14.439 13.746
Ramarama 4.195 1.659 0.656
Takapau 2.000√ 4.000 4.001
Tuakau 4.075 4.075 4.076
Waikuku^ 0.073 0.145 0.145
Wellington 467.480√ 926.686 912.173

^ During 2002 Waimauku and Waikuku gates have been removed. Bruce McLaren has been interconnected with other Auckland Central Networks.

√ UnitedNetworks sold the gas pipelines in Hawkes Bay, Palmerston North and Wellington to Power Co effective from 1 November 2002. This has affected the system length as 'b' in the above formula is nil.



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 54


Gazette.govt.nz PDF NZ Gazette 2003, No 54





✨ LLM interpretation of page content

🏭 UnitedNetworks Limited Gas Information Disclosure (continued from previous page)

🏭 Trade, Customs & Industry
14 May 2003
Energy Delivery, Efficiency Measures, Load Factor, Gas Systems, Performance Statistics, System Length