β¨ Marlborough Lines Limited Performance Measures
NEW ZEALAND GAZETTE
No. 135
| 2003 | 2002 | 2001 | 2000 | |
|---|---|---|---|---|
| (d) | Transformer Capacity in kVA* | |||
| actual 31 March 2003 | 331,616 | 222,362 | 211,863 | |
| 368,219 | ||||
| (e) | Maximum demand in kW* | |||
| actual post-acquisition maximum | 92,346 | 55,609 | 56,224 | |
| 104,765 | ||||
| (f) | Total Electricity entering the System in kWh (before losses - 2000/01 figures are after losses) | |||
| 598,113,952 | 303,561,295 | 290,043,148 | ||
| (g) | Total Electricity supplied from the System on behalf of each generator and retailer in kWh (after losses - 2000/01 figures are before losses) | |||
| Retailer B | 312,528,041 | 216,073,128 | 245,998,574 | |
| Retailer C | 219,692,247 | 57,955,341 | 39,939,715 | |
| Retailer D | 2,224,543 | 2,482,763 | 9,794,061 | |
| Retailer E | - | 2,928,427 | 10,392,034 | |
| Retailer F | 1,550,650 | 2,640,299 | 1,966,857 | |
| Retailer G | 28,041,235 | 4,280,802 | - | |
| Total | 564,036,716 | 286,360,760 | 308,091,241 |
Note: the above energy volumes are based on information provided by Energy Retailers; Marlborough Lines cannot assure readers as to the accuracy of this information
| (h) | Total Consumers* |
| | actual 31 March 2003 | 32,196 | 21,038 | 20,805 | 20,572 |
| | | 35,915 | | | |
REGULATION 22 RELIABILITY PERFORMANCE MEASURES
| | average | target | | actual |
| | | 2004-08 | 2004 | 2003 | 2002 | 2001 | 2000 |
|-------|----------|---------|-------|-------|------|------|------|
| 1.-3. | Number of interruptions and interruption Targets by class |
| (a) | Class A - Transpower Planned | 257 | 261 | - | - | 145 | 117 |
| (b) | Class B - Line Owner Planned | 386 | 393 | 329 | 159 | 283 | 302 |
| | Class C - Line Owner Unplanned | | | 322 | 283 | - | 125 |
| (d) | Class D - Transpower Unplanned | | 4 | - | 1 | - | - |
| | Class E - ECNZ Unplanned | - | - | - | - | 9,201| - |
| | Class F - Other Generation | - | - | - | - | - | - |
| | Class G - Other Line Owner Unplanned | - | - | - | - | - | - |
| | Class H - Other Line Owner Planned | - | - | - | - | - | - |
| | Class I - Other | - | - | - | - | - | - |
| | Total | | 655 | 443 | 447 | 242 |
Note: 2003 includes MLL faults for the entire year and OtagoNet faults from July 2002 to March 2003
| 4. | Percentage of Class C interruptions not restored within |
| (a) | Three hours | 15.5% | 29.3% | 29.5% | 22.4% |
| (b) | 24 hours | 0.3% | 2.8% | 1.6% | 2.4% |
| 5. | Faults (Class C) per 100 kilometres |
| | Total number of faults per 100 km |
| 33 kV | | 1.9 | 1.9 | 1.1 | 3.8 | 3.9 | 0.8 |
| 11kV | | 7.0 | 7.1 | 7.4 | 13.2 | 14.2 | 5.8 |
| 6.6kV | | - | - | 1.1 | - | - | 2.0 |
| Total | | 6.3 | 6.4 | 6.1 | 11.9 | 12.8 | 5.2 |
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2003, No 135
Gazette.govt.nz —
NZ Gazette 2003, No 135
β¨ LLM interpretation of page content
ποΈ
Marlborough Lines Limited Financial Performance Measures
(continued from previous page)
ποΈ Infrastructure & Public WorksFinancial Performance, ROF, ROE, ROI, Operating Surplus, Net Surplus, Amortisation, Depreciation, Revaluations, Income Tax, Energy Delivery Efficiency, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Circuit Length, Overhead System, Underground System
ποΈ Marlborough Lines Limited Reliability Performance Measures
ποΈ Infrastructure & Public WorksReliability, Interruptions, Faults, Transformer Capacity, Maximum Demand, Electricity Supply, Consumers, Performance Targets, Restoration Time